A Hybrid Fuzzy TOPSIS – Best Worst Method for Risk Prioritization in Megaprojects
محل انتشار: ژورنال مهندسی عمران، دوره: 5، شماره: 6
سال انتشار: 1398
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 139
فایل این مقاله در 16 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_CEJ-5-6_006
تاریخ نمایه سازی: 28 تیر 1404
چکیده مقاله:
Megaprojects are usually complex and in many cases encounter failure in terms of finish late or overspent. This study aims to investigate the critical risk factors behind these projects as well as their priority. Project risk management is a mature research stream. But when focus on megaprojects the amount of research decreases significantly. This research provides a hierarchy of risk structure in Tehran-Rasht railway megaproject and prioritizes the risk factors through a two-phase methodology. This method is a new hybrid MCDM technique consist of group fuzzy TOPSIS and fuzzy Best-Worst Method. BWM is the latest MCDM technique which in this paper, its fuzzy version combined with fuzzy TOPSIS is employed. This research also considers all the project success criteria including time, cost and quality simultaneously and calculates the risk priority Index (RPI) accordingly. The results imply that quality is the most important project success factor and the risk elements with greater impact on project quality, get higher PRI. The identified and ranked risk factors help practitioners and academics to follow the subsequent steps of the risk management process of Iranian transportation megaprojects.Megaprojects are usually complex and in many cases encounter failure in terms of finish late or overspent. This study aims to investigate the critical risk factors behind these projects as well as their priority. Project risk management is a mature research stream. But when focus on megaprojects the amount of research decreases significantly. This research provides a hierarchy of risk structure in Tehran-Rasht railway megaproject and prioritizes the risk factors through a two-phase methodology. This method is a new hybrid MCDM technique consist of group fuzzy TOPSIS and fuzzy Best-Worst Method. BWM is the latest MCDM technique which in this paper, its fuzzy version combined with fuzzy TOPSIS is employed. This research also considers all the project success criteria including time, cost and quality simultaneously and calculates the risk priority Index (RPI) accordingly. The results imply that quality is the most important project success factor and the risk elements with greater impact on project quality, get higher PRI. The identified and ranked risk factors help practitioners and academics to follow the subsequent steps of the risk management process of Iranian transportation megaprojects.
کلیدواژه ها:
Best-Worst Method (BWM) Decision-making Fuzzy TOPSIS Megaprojects Risk Assessment.
نویسندگان
Ashraf Norouzi
Tarbiat Modares University, Faculty of Industrial Engineering, Tehran,, Iran, Islamic Republic of
Hamid Ghayur Namin
Islamic Azad University of Yazd, Safaeih , Yazd,, Iran, Islamic Republic of