Delay Factors in Building Construction Project of State Elementary School
محل انتشار: ژورنال مهندسی عمران، دوره: 6، شماره: 3
سال انتشار: 1399
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 31
فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_CEJ-6-3_009
تاریخ نمایه سازی: 28 تیر 1404
چکیده مقاله:
The state elementary school No.۰۲۷ building construction project in Samarinda Ulu District, Samarinda City, Indonesia, in the ۲۰۱۹ fiscal year, which experienced delays, was allegedly due to the use of inappropriate scheduling methods. Therefore, to overcome these delays, it must use the curtain methods that are appropriate with efficient cost. In this study, we used factor analysis and multiple linear regression methods to measure answers from a questionnaire distributed to ۴۵ respondents like consultants, contractors, and owners who were involved in the state elementary school in above. The results show that the elements that influence the delay in the construction of state elementary school building No.۰۲۷ Samarinda is a factor in the work scheduling method and construction delay. For Scheduling work get a coefficient value is , and for construction delay method get a coefficient value is . It can be concluded is the most dominant factor construction delay in the State Elementary School No.۰۲۷ Samarinda in case above is the Work Scheduling Method with a value coefficient is ۱.۰۵۷.The state elementary school No.۰۲۷ building construction project in Samarinda Ulu District, Samarinda City, Indonesia, in the ۲۰۱۹ fiscal year, which experienced delays, was allegedly due to the use of inappropriate scheduling methods. Therefore, to overcome these delays, it must use the curtain methods that are appropriate with efficient cost. In this study, we used factor analysis and multiple linear regression methods to measure answers from a questionnaire distributed to ۴۵ respondents like consultants, contractors, and owners who were involved in the state elementary school in above. The results show that the elements that influence the delay in the construction of state elementary school building No.۰۲۷ Samarinda is a factor in the work scheduling method and construction delay. For Scheduling work get a coefficient value is , and for construction delay method get a coefficient value is . It can be concluded is the most dominant factor construction delay in the State Elementary School No.۰۲۷ Samarinda in case above is the Work Scheduling Method with a value coefficient is ۱.۰۵۷.
کلیدواژه ها:
Delay Scheduling Factors Scheduling Method Building Construction Project.
نویسندگان
Raden Risang Haryo C. D.
Civil Engineering of Construction Management, Institut Teknologi Nasional Malang,, Indonesia
Lalu Mulyadi
Civil Engineering of Construction Management, Institut Teknologi Nasional Malang,, Indonesia
Tiong Iskandar
Civil Engineering of Construction Management, Institut Teknologi Nasional Malang,, Indonesia