Optimization Framework for ASIAN and National Road Networks in Lao PDR Using the Stochastic Markov Model

سال انتشار: 1404
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 48

فایل این مقاله در 16 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_CEJ-11-5_023

تاریخ نمایه سازی: 19 خرداد 1404

چکیده مقاله:

Developing effective road network management is crucial for the socioeconomic development of developing countries, particularly the Lao People’s Democratic Republic (Lao PDR or Laos). The current road maintenance system in Lao PDR uses a traditional reactive maintenance approach, addressing road deterioration only after the condition reaches a critical state. This study proposes a stochastic Markov Decision Process (MDP) framework to enhance traditional road management practices. The proposed MDP framework shifts from a conventional reactive to a proactive strategy by considering probabilistic pavement performance and optimally allocating funding to rapidly deteriorating sections. This study enables decision-makers to determine the optimal intervention strategies based on different scenarios. The comparison of the ASIAN Road network, high technical design and construction, and the National Road network, standard technical design and construction, in different scenarios provides a workable framework for maintaining Laos, and other developing countries, road condition despite limited resources and sustainable development concerns. This comprehensive framework includes estimating deterioration rates, defining policies, conducting life-cycle cost (LCC) analysis, and determining optimal strategies that minimize LCC subject to financial and performance constraints. This study highlights significant improvements in decision-making, particularly in resource allocation, by creating innovative and preventive approaches that enhance the efficiency of road management systems and ensure sustainable maintenance practices in Lao PDR. Doi: ۱۰.۲۸۹۹۱/CEJ-۲۰۲۵-۰۱۱-۰۵-۰۲۳ Full Text: PDF

کلیدواژه ها:

Optimum Road Intervention Strategy ، Markov Decision Process ، Laos Road Management Systems ، Life-Cycle Cost Analysis.

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • MPWT. (2022). MPWT Yearly Statistic 2021. Ministry of Public Works ...
  • Ishida, M. (2019). Inland ASEAN road connectivity: Challenges and prospects. ...
  • Kerali, H. R. (2001, May). The role of HDM-4 in ...
  • Li, N., Haas, R., & Xie, W. C. (1997). Investigation ...
  • MPWT. (2022). 3-Year Rolling Road Maintenance Plan 2022–2024. Ministry of ...
  • Bennett, C. R. (2008). Success Factors for Road Management Systems. ...
  • Thube, D., & Thube, A. (2013). Software development for calibration ...
  • Robinson, R., Danielson, U., & Snaith, M. (1998). Road maintenance ...
  • Obunguta, F., Kaito, K., Sasai, K., Kobayashi, K., Matsushima, K., ...
  • Nakazato, Y., Mizutani, D., & Fukuyama, S. (2023). Optimal Repair ...
  • Nakazato, Y., & Mizutani, D. (2024). 365-Day Sectional Work Zone ...
  • Zhang, L., Gu, W., Byon, Y. J., & Lee, J. ...
  • Obunguta, F., Matsushima, K., & Bakamwesiga, H. (2022). Social Cost ...
  • Harvey, M. O. (2024). Estimating from an optimisation model the ...
  • Zeng, Q., Xiao, F., Sun, X., Yang, S., & Cui, ...
  • Puterman, M. L. (1994). Markov Decision Processes. Wiley Series in ...
  • Feinberg, E. A., & Shwartz, A. (2012). Handbook of Markov ...
  • Yates, R. D., & Goodman, D. J. (1999). Probability and ...
  • Tsuda, Y., Kaito, K., Aoki, K., & Kobayashi, K. (2006). ...
  • Han, D., Kaito, K., Kobayashi, K., & Aoki, K. (2016). ...
  • Kobayashi, K., Kaito, K., & Lethanh, N. (2012). A statistical ...
  • Kobayashi, K., Do, M., & Han, D. (2010). Estimation of ...
  • Lancaster, T. (1990). The Econometric Analysis of Transition Data. Cambridge ...
  • Kobayashi, K., Eguchi, M., Oi, A., Aoki, K., & Kaito, ...
  • Obunguta, F., & Matsushima, K. (2022). Optimal pavement management strategy ...
  • Li, Y., & Madanat, S. (2002). A steady-state solution for ...
  • Sutton, R. S., & Barto, A. G. (1998). Reinforcement learning: ...
  • Lv, J., Wang, X., Huang, M., Cheng, H., & Li, ...
  • Rinnooy Kan, A. H. G., Stougie, L., & Vercellis, C. ...
  • MPWT. (2009). Road Management System – Traffic Survey Manual. Ministry ...
  • Gharieb, M., & Nishikawa, T. (2021). Development of Roughness Prediction ...
  • JICA. (2018). The Project for Improvement of Road Management Capability ...
  • MPWT. (2021). Road Asset Management Plan. Ministry of Public Works ...
  • Hastings, W. K. (1970). Monte Carlo sampling methods using Markov ...
  • Metropolis, N., Rosenbluth, A. W., Rosenbluth, M. N., Teller, A. ...
  • MPWT. (2016). RMS Analysis Report for National Roads. Ministry of ...
  • نمایش کامل مراجع