An investigation into the adverse impacts of incompetency of site managers on productivity of Iranian construction projects
محل انتشار: هفتمین کنگره ملی مهندسی عمران
سال انتشار: 1392
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,093
فایل این مقاله در 6 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
NCCE07_1444
تاریخ نمایه سازی: 16 مهر 1392
چکیده مقاله:
Taking into account that in many construction projects in Iran operatives are paid based on hours of presence on sites, any wasted time equals loss of revenue for the contractors by adversely affecting the productivity on sites. On the other hand, ineffective management of construction sites is regarded as one the factors contributing to the loss of productive time in construction projects in many countries including a developing country such as Iran. This paper defines some general indices and symptoms of ineffective construction site managers. Aiming at evaluating the quantitative effect of these elements, the authors conducted a survey in order to elicit the perceptions of Iranian construction project managers regarding the intensity of foregoing elements in declining the productivity level. The results showed that delegating the management of sites to unqualified managers would increase the actual time for activities completion up to 58% of the average logical required time
کلیدواژه ها:
نویسندگان
M. Reza Hosseini
University of South Australia, Adelaide, Australia
Nicholas Chileshe
University of South Australia, Adelaide, Australia
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :