A Generalized Mathematical Model for Integrated Production Planning in Drift-and-Fill Mining Operation

سال انتشار: 1403
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 132

فایل این مقاله در 14 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_JMAE-15-4_013

تاریخ نمایه سازی: 17 شهریور 1403

چکیده مقاله:

Drift-and-fill mining is a variation of cut-and-fill mining method. Drift-and-fill mining method refers to the excavation of several parallel drifts in ore. Excavation of a new drift could start when its adjacent drifts are backfilled or not excavated. The amount of ore material and its grade depends on the excavation sequence of drifts. As the number of drifts increases, one will need a model to optimize the drift excavation and backfilling sequence. This paper introduces a mathematical model to determine the optimal drift-and-fill sequence while the safety constraints, excavation, and backfilling capacities and their dependencies are satisfied. The model seeks to minimize the deviations from some predefined goals, and it handles the long-term and short-term constraints in separate and integrated scenarios. An application of the model is presented based on the data available from a lead/zinc underground mining project. There are ۹۱ drifts in the selected level. Based on the monthly planning horizon, the integrated model leads to the slightest deviations in both the mining rate and average grade, and the deviation from the predetermined annual goals is negligible. For the case where long-term and short-term plans are determined separately, the deviation is approximately ۱۰%.

نویسندگان

Mehdi Rahmanpour

School of Mining, College of Engineering University of Tehran, Tehran, Iran

Golpari Norozi

School of Mining, College of Engineering University of Tehran, Tehran, Iran

Hassan Bakhshandeh Amnieh

School of Mining, College of Engineering University of Tehran, Tehran, Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • . Chanda, E.C.K. (۱۹۹۰). An application of integer programming and ...
  • . Wooller, R. (۱۹۹۲). Production scheduling system. Transactions of the ...
  • . Pourrahimian, Y., & Askari-Nasab, H. (۲۰۱۳). A multi-step approach ...
  • . Chowdu, A., Nesbitt, P., Brickey, A., & Newman, A.M. ...
  • . Shami-Qalandari, M., Rahmanpour, M., & Mirabedi, S.M.M., (۲۰۲۲). Determining ...
  • . Sotoudeh, F., Ataei, M., Kakaie, R., & Pourrahimian, Y. ...
  • . Nehring, M., Topal, E., Kizil, M., & Knights, P. ...
  • . Jawed, M. (۱۹۹۳). Optimal production planning in underground coal ...
  • . Newman, A.M., Rubio, E., Caro, R., Weintraub, A., & ...
  • . Trout, L.P. (۱۹۹۵). Underground mine production scheduling using mixed ...
  • Nehring, M. (۲۰۰۶). Stope sequencing and optimization in underground hard ...
  • . Little, J., Knights, P., & Topal, E. (۲۰۱۳). Integrated ...
  • . O’Sullivan, D., & Newman, A. (۲۰۱۵). Optimization-based heuristics for ...
  • . Terblanche, S., & Bley, A. (۲۰۱۵). An improved formulation ...
  • . Huang, S., Li, G., Ben-Awuah, M., Afum, B.O., & ...
  • . Foroughi, S., Khademi, J., Monjezi, M., & Nehring, M., ...
  • . Shenavar, M., Ataee-pour, M., & Rahmanpour, M. (۲۰۲۰). A ...
  • . Sari, Y.A., & Kumral, M. (۲۰۲۱). Clustering-based iterative approach ...
  • . Kumral, M., & Sari, Y.A., (۲۰۲۰). Underground mine planning ...
  • . Topal, E., (۲۰۰۸). Early start and late start algorithms ...
  • . Rahmanpour, M., Osanloo, M., & Mirabedi, S.M.M. (۲۰۲۲). Estimating ...
  • . Morin, M., Bamber, A. & Scoble, M. (۲۰۰۴). Systems ...
  • A new classification system for evaluation and prediction of unplanned dilution in cut-and-fill stoping method [مقاله ژورنالی]
  • . Manriquez, F., Perez, J., & Morales, N. (۲۰۲۰). A ...
  • . Brickey, A.J., Chowdu, A., Newman, A., Goycoolea, M., & ...
  • . Nehring, M., & Topal, E. (۲۰۰۷). Production schedule optimisation ...
  • . Nehring, M., Topal, E., & Knights, P. (۲۰۱۰). Dynamic ...
  • . Ogunmodede, O., Lamas, P., Brickey, A., Bogin, J.G., & ...
  • . Campeau, L.P., & Gamache, M. (۲۰۲۰). Short-term planning optimization ...
  • Campeau, L.P., Gamache, M., & Martinelli, R. (۲۰۲۲). Integrated optimization ...
  • . Stephan, G. (۲۰۱۱). Cut-and-fill Mining. Chapter ۱۳.۵. In: Darling, ...
  • . Swan, G., & Brummer, R.K. (۲۰۰۱). Backfill design for ...
  • . Dawson, L., Yumlu, M., & English, M. (۲۰۰۸). Drift ...
  • . Neves, J., Araujo, C. & Soares, A. (۲۰۲۱). Uncertainty ...
  • . Spearing, A.S., Ma, L. & Ma, C.A. (۲۰۲۲). Mine ...
  • . Peng, C., Liu, Y., Zhu, M., Hou, K., Liu, ...
  • . Ran, J.J. (۲۰۱۹). Safe mining practices under wide spans ...
  • . Hu, Y., Han, B., Zhang, B. & Li, K. ...
  • . Keita, A.M.T., Jahanbakhshzadeh, A. & Li, L. (۲۰۲۲). Numerical ...
  • . Goodwin, G.C., Seron, M.M., Middleton, R.H., Zhang, M., Hennessy, ...