Identification and evaluation of social risks in industrial-civil megaprojects with the help of multi-criteria decision-making techniques and system dynamics
سال انتشار: 1403
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 17
فایل این مقاله در 15 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJNAA-15-10_022
تاریخ نمایه سازی: 17 تیر 1403
چکیده مقاله:
Megaprojects play an important role in economics, society, and the environment and during recent years have fast developed. However, due to frequent social involvement induced by the social impact, social risk control has become a big challenge. So, this study is based on the systematic analysis of social risks and behavioural models in megaprojects. This study proposed a model composed of multi-criteria decision-making techniques and system dynamics to analyze the social risks for megaprojects. After choosing the desired risks in the social dimension and obtaining the causal relationships through the DEMATEL-ANP (DANP) method, as seen in the chart, the relationships between the extant variables can be investigated and concluded. The results show that some risks including timely completion of the project and related issues regarding increasing time based on social problems, the extreme internal and external dissatisfaction of megaprojects, and the decreasing risk due to increasing cost are ranked the first, second, and third one, respectively. Also, the extreme internal and external dissatisfaction of the megaproject has the most impact. In this proposed model, the factors affecting the risk related to the timely completion of the project and associated issues regarding the increasing time can be investigated in such a way that the values of this parameter have increased because of an increase in the internal variables, and vice versa. The mutual impact of the variable, the extreme internal and external dissatisfaction of the megaproject, the decreasing risk of the project quality due to excessive increasing cost in terms of social and unpredicted issues, and social interventions of beneficiaries on the timely completion risk of the project and issues of increasing time can be observed. Also, in the below charts, the behaviour of this model has been investigated during ۱۰ coming years by different scenarios. This study can facilitate the perception of social risk in terms of the risk evolution and provide the decision-making support to overcome the social risk with megaproject operation.
کلیدواژه ها:
نویسندگان
Seyed Amin Seyedi
Department of Civil Engineering, Yazd Branch, Islamic Azad University, Yazd, Iran
Alireza Mirjalili
Department of Civil Engineering, Yazd Branch, Islamic Azad University, Yazd, Iran
Mahoudreza Maheri
Department of Civil Engineering, Shiraz University, Shiraz, Iran
Abolfazl Sadeghian
Department of Industrial Management, Yazd Branch, Islamic Azad University, Yazd, Iran
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :