Multi-agent single machine scheduling problem with transportation constraints
محل انتشار: مجله مدلسازی ریاضی، دوره: 10، شماره: 3
سال انتشار: 1401
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 167
فایل این مقاله در 19 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_JMMO-10-3_001
تاریخ نمایه سازی: 19 خرداد 1403
چکیده مقاله:
A multi-agent single machine scheduling problem with transportation constraints is studied. We assume that there are several independent agents placed in different geographical locations, each of them has several orders and each order includes different types of products. We use a simple and effective model to obtain maximum profit of the products. To have desired on-time deliveries, the minimization of the transportation costs and total tardiness costs are considered as objective functions. The main idea of this research is to develop a simple and integrated scheduling and transportation model which can be applied in many factories, chain stores, and so on. In order to solve this problem, a mixed integer linear programming (MILP) model is presented. Moreover, since solving large instances of the proposed MILP model is very time-consuming, a heuristic algorithm is presented. Implementing of two approaches on a variety of datasets show that the heuristic algorithm can provide good-quality solutions in very short time.
کلیدواژه ها:
Single machine scheduling problem ، transportation constraints ، mixed integer linear programming ، heuristic algorithm
نویسندگان
Mohsen Ziaee
Department of Industrial Engineering, University of Bojnord, Bojnord, Iran
Mahdi Imanparast
Department of Computer Science, University of Bojnord, Bojnord, Iran
Vahid Khodabakhshi
Department of Industrial Engineering, University of Bojnord, Bojnord, Iran