Construction Project Delay Risk Assessment Based on ۴M۱E Framework and Afghanistan Situation
محل انتشار: ژورنال مهندسی عمران، دوره: 10، شماره: 1
سال انتشار: 1403
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 49
فایل این مقاله در 17 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_CEJ-10-1_006
تاریخ نمایه سازی: 2 اردیبهشت 1403
چکیده مقاله:
In the realm of construction project management, delays present a significant impediment, particularly within complex socio-political contexts such as Afghanistan. This study endeavors to elucidate the multifaceted nature of construction project delays in Afghanistan, employing the ۴M۱E (Man, Machine, Material, Method, and Environment) framework to conduct a comprehensive risk assessment. The research methodology entailed the development of a structured questionnaire grounded in an extensive review of pertinent literature, targeting ۳۰ recognized causes of project delays. This instrument was administered to a representative sample of ۱۴۴ professionals across the Afghan construction industry spectrum, including clients, consultants, and contractors. Analytical rigor was applied through the deployment of frequency, severity, and importance indices to evaluate the collected data. This analysis culminated in the distillation of ten paramount delay risk factors, encapsulating elements such as governmental policy stability modifications in project scope and design alongside delays in material testing and approval processes. A comparative dimension was incorporated to benchmark these findings against global standards, thereby enhancing the robustness of the study’s conclusions. Moreover, the research delineates the congruence and discordance among different respondent cohorts, bolstering the integrity of the identified delay factors through a validation of internal consistency and reliability. The strategic application of the ۴M۱E framework, contextualized within the Afghan construction landscape, furnishes pivotal insights for stakeholders, equipping them with a nuanced understanding necessary for the proactive mitigation of delay risks. The implications of this study are far-reaching, promising to augment project completion efficiency, budget adherence, and overall project success, with particular resonance for environments paralleling the intricacies of Afghanistan. Doi: ۱۰.۲۸۹۹۱/CEJ-۲۰۲۴-۰۱۰-۰۱-۰۶ Full Text: PDF
کلیدواژه ها:
Construction Project Delay Risks ، Questionnaire Survey ، ۴M۱E Framework ، Critical Delay Risk ، Afghanistan Situations.
نویسندگان
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :