A new bi-objective green construction model for multi project supply chain management under uncertainty

سال انتشار: 1402
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 129

فایل این مقاله در 17 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_IJIEPR-35-1_005

تاریخ نمایه سازی: 19 اسفند 1402

چکیده مقاله:

The construction supply chain is presently the focus of considerable interest among numerous project-related businesses. Strong project management is essential for the effective completion of a project, since restricted budgets and time constraints are considered for each project. The research uses multi-objective linear programming to create a mathematical model of the building supply chain. The primary aims of the present investigation are to limit the expenses associated with logistics and to diminish the release of greenhouse gases caused by transportation. Given the reality of managing several projects concurrently, the model provided comprises a network of projects. Following the completion of each project, an inspection is arranged to assess its level of success. Estimating the costs of a project relies on several variables. In reality, there are always uncertainties highlighted in several studies about the uncertainty of cost and time parameters. This research incorporates many characteristics concurrently to simulate real-world settings and address the issue of uncertainty. The expression of uncertainty for all costs, activity length, inspection, supplier capacity, and resource demand are represented by triangular fuzzy numbers. Ultimately, the precision of the model's performance has been verified using a numerical illustration.

نویسندگان

Simin Dargahi Darabad

School of industrial Engineering, Iran University of Science and Technology

Maryam Izadbakhsh

School of industrial Engineering, Iran University of Science and Technology

Seyed Farid Ghannadpour

Assistant professor, School of industrial Engineering, Iran University of Science and Technology

Siamak Noori

School of industrial Engineering, Iran University of Science and Technology

Mohammad Mahdavi mazdeh

School of industrial Engineering, Iran University of Science and Technology

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Love, P.E.D., et al., Determining the Probability of Project Cost ...
  • ; Available from: https://www.statista.com/statistics/۷۸۸۱۲۸/construction-spending-worldwide ...
  • Mahamid, I., A. Bruland, and N. Dmaidi, Causes of Delay ...
  • Chen, S.-M., et al., A framework for an automated and ...
  • Lucko, G. and Y. Su, Singularity Functions as New Tool ...
  • Vrijhoef, R. and L. Koskela, The four roles of supply ...
  • Durdyev, S. and M.R. Hosseini, Causes of delays on construction ...
  • Lessing, B., D. Thurnell, and S. Durdyev, Main factors causing ...
  • Hammami, R., Y. Frein, and A.B. Hadj-Alouane, Supply chain design ...
  • Costa, F., et al., Understanding Relative Importance of Barriers to ...
  • Vanteddu, G., R.B. Chinnam, and O. Gushikin, Supply chain focus ...
  • Badi, S. and N. Murtagh, Green supply chain management in ...
  • Zhu, Q., J. Sarkis, and K.-h. Lai, Confirmation of a ...
  • Rabiatul Adawiyah, W., et al., Green supply chain management and ...
  • You, J., et al., Uncertainty, opportunistic behavior, and governance in ...
  • Herroelen, W. and R. Leus, Project scheduling under uncertainty: Survey ...
  • Durbach, I.N. and T.J. Stewart, Modeling uncertainty in multi-criteria decision ...
  • Emami, M.R., I.B. Turksen, and A.A. Goldenberg, Development of a ...
  • Kelley Jr, J.E. and M.R. Walker. Critical-path planning and scheduling. ...
  • Essam, N., L. Khodeir, and F. Fathy, Approaches for BIM-based ...
  • Liu, N., Y.F. Zhang, and W.F. Lu, Energy-efficient integration of ...
  • Assaf, S.A. and S. Al-Hejji, Causes of delay in large ...
  • Patoghi, A. and S.M. Mousavi, A new approach for material ...
  • Zhang, Y. and N. Cui, Project scheduling and material ordering ...
  • Noori, M., et al., Assessment of Supply Chain Performance Management ...
  • O’Brien, W.J., K. London, and R. Vrijhoef. Construction supply chain ...
  • Cheng, J.C.P., et al., A service oriented framework for construction ...
  • Arditi, D. and H.M. Gunaydin, Total quality management in the ...
  • Dainty, A.R.J., G.H. Briscoe, and S.J. Millett, Subcontractor perspectives on ...
  • Saad, M., M. Jones, and P. James, A review of ...
  • Abdzadeh, B., S. Noori, and S.F. Ghannadpour, Simultaneous scheduling of ...
  • Handfield, R.B., et al., ‘Green’value chain practices in the furniture ...
  • Da Silveira, G. and N. Slack, Exploring the trade‐off concept. ...
  • Nouri, M., E. Mohammadi, and M. Jabalameli, Sustainable supply chain ...
  • Kian, H., E. Mohammadi, Seyed Babak, and S.J. Hosseininezhad, Designing ...
  • Morovati Sharifabadi, A., et al., Evaluating Green Supplier Development Programs ...
  • Ojo, E., C. Mbowa, and E.T. Akinlabi. Barriers in implementing ...
  • Peng, H., et al., Uncertainty factors, methods, and solutions of ...
  • Liu, B., Integration of novel uncertainty model construction of green ...
  • Salari, S.A.-S., et al., Off-Site Construction Three-Echelon Supply Chain Management ...
  • Chen, Z., et al., Modelling supplier selection and material purchasing ...
  • نمایش کامل مراجع