Inspecting the Executive Method at the Intersection of Pipeline and Road Transportation Systems

سال انتشار: 1402
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 215

فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

EBUCONF19_008

تاریخ نمایه سازی: 2 آبان 1402

چکیده مقاله:

Crossing water, oil and gas pipelines from roads has always been accompanied by the destruction of the pavement structure, which in practice causes many problems. The pipe jacking method is a very convenient and economical way to facilitate pipeline transportation at the time of intersection with road transport. In this method, due to the lake of the pavement destruction, the route traffic does not stop and excavation volume is dramatically reduced. On the other hand, due to the lack of traffic diversion, security is much higher. The operating procedure in this system is conducted through drilling and tubing by means of hydraulic jacks. One of the ways to maintain the existing pavement during the passing of facilities through it is the implementation of the pipe jacking system, as will be discussed in this paper. One of the advantages of this method is reducing the amount of excavation, reducing costs, reducing manpower, increasing efficiency and speeding up the performance. The other advantages of this executive method is the correspondence with the environment.

نویسندگان

Masoud abdoulrezaei

Road Maintenance and Transportation Organization, Kermanshah, Iran

Khalil Jalili

Civil Engineering, Department of Kermanshah ACECR Institute of Higher Education, Kermanshah, Iran

Ramin Bayat

Road Maintenance and Transportation Organization, Kermanshah, Iran