Ignoring Wellbore Stability Analysis Caused huge NPT in an Iranian Gas Field

سال انتشار: 1401
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 199

فایل این مقاله در 9 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

NPGC04_074

تاریخ نمایه سازی: 16 اسفند 1401

چکیده مقاله:

Wellbore stability (WBS) problems causes huge Non-Productive Time (NPT) and cost during drilling. Drilling ۱۲ development wells in a high-pressure high temperature (HPHT) gas field showed different non-productive time (NPT) values due to different severity of WBS issues such as lost circulation, kick flows, tight holes, stuck pipes which are responsible for repeated reaming, fishing and sidetracking. To reveal the reasons for the different severity of WBS problems in the studied wells and enhance future drilling, this work focused its investigation on the ۱-D geomechanical modeling and WBS analysis. The results of the constructed ۱-D geomechanical model show that well trajectory parameters of azimuth and inclination angle have crucial effects on the safe mud weight (MW) window and the consequent WBS problems. The stable MW window decreases as the borehole deviation increases, the maximum allowable inclination angle was determined as ۵۰ degrees; otherwise, severe WBS issues are expected during drilling. The well azimuth showed to have trivial effect on the breakout mud weight, whereas the breakdown mud weight is significantly greater in wells drilled in the direction of minimum horizontal stress (NW-SE). Therefore, as safe mud weight windows are broader in wells with NW-SE, it is expected that such wells have greater wellbore stability than wells drilled in other directions. Therefore, the different extent of the actual field WBS issues in the studied wells was attributed to their well trajectories, in accordance with the WBS analysis. Wellbore trajectory parameters Optimization while taking into account reservoir targets are recommended for future drilling in HPHT fields. This would contribute to reducing WBS problems and NPT for subsequent drilling jobs and finally contribute to more efficient drilling operations.

نویسندگان

Abbas Roohi

Head of Drilling Engineering at NIDC

Mehran Makvandi

NIDC Deputy of CEO