Value engineering and its impact on construction projects using building information modeling
سال انتشار: 1400
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 150
فایل این مقاله در 5 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_BDCV-1-2_001
تاریخ نمایه سازی: 28 دی 1401
چکیده مقاله:
Due to the fact that science is advancing and construction in our society is increasing, the engineering community is also obliged to introduce new approaches to the country and use them in this field. The traditional method (CAD) used to be used in this field and now the engineering community in most of the world uses Building Information Modeling (BIM) technology. BIM helps the project team observe what will be built in a simulated environment. This study examines the role of BIM in reducing time, cost savings, quality improvement, monitoring, control, estimating time and cost, comparing current conditions with standards, and reporting. We also compared the two projects, one using BIM and the other using the traditional method. The results showed that the use of BIM helps to include value engineering in projects, collisions do not occur during project implementation .
کلیدواژه ها:
نویسندگان
Hadi Faghihmaleki
Department of Civil Engineering, Ayandegan Institute of Higher Education, Tonekabon, Iran.
Saman Rahimireskati
Department of Civil Engineering, Deakin University, Waurn Ponds, Geelong, Australia.
Mohamamd Darbandi
Department of Civil Engineering, Ayandegan Institute of Higher Education, Tonekabon, Iran.
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :