Selection of best method for project scheduling considering risk and stochastic activity duration time

سال انتشار: 1401
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 248

فایل این مقاله در 5 صفحه با فرمت PDF و WORD قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

MNGC05_023

تاریخ نمایه سازی: 29 شهریور 1401

چکیده مقاله:

Over time, the project managers' attention, to find a schedule baseline that completes the project with all its constraints, has increased. So far, various methods have been developed to schedule the project and achieve the shortest completion time. This paper extends the work made by Acebes et al. (۲۰۲۱). They integrate project risk management into project scheduling and select the best scheduling method according to the final risk of each schedule. This paper applies a different method to make project activities' duration time stochastic and calculate the project total risk to select the best project scheduling method.

نویسندگان

H Norouzi

Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran

S.M.T S.M.T

Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran