GHAZVIN IRRIGATION SYSTEM CONSTRAINS & DIFFICULTIES – PRACTICAL SOLUTIONS
سال انتشار: 1386
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,996
فایل این مقاله در 14 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
PIM10_065
تاریخ نمایه سازی: 5 شهریور 1385
چکیده مقاله:
As a result of carrying out the Ghazvin Development Project (GDP), aiming Agricultural and Rural development in an area of 80,000 ha. in a period of three decades (1960, 1970 and 1980), Ghazvin irrigation system consisting of 1053km (including the main, secondary, tertiary, quaternary canals and the pertinent structures) have been constructed and operated. Since 1993, the management, operation and maintenance (O & M) responsibilities of the above system have been assigned to the "Ghazvin Irrigation System Operation Company" (GISOC). Now a region in a nearly 60,000 ha net area with nearly 30,000 water users and an annually 630 mm3 irrigation water is under the service of the Ghazvin Irrigation System (GIS). The public and semi-public managements over the system in a period of nearly three decades, have caused unexpected difficulties, deficiencies and constrains in the system. Recently the Ministry of Energy (MOE) planned to study the rehabilitation of the
system and its relevant management, which was assigned to Pandam Consulting Engineers.
Based on the above mentioned study and findings, advices and solutions have been proposed for rehabilitation of the system and improvement of the irrigation management, and irrigation management transfer (IMT) to water users' organizations as well and settle the participatory irrigation management based on the proposed solutions.
کلیدواژه ها:
نویسندگان
Ebrahim Kahrizi
Project Manager and Senior Engineer in Water Resources Management Pandam Consulting Engs
Mirkazem Razavi
Senior Engineer in Water Resources Management Pandam Consulting Engs. and Member of Iranian National Committee on Irrigation and Drainage (IRNCID).