Incorporating Risk Assessment in Maintenancescheduling Regarding Reward Penalty Scheme

سال انتشار: 1393
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 210

فایل این مقاله در 6 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

CIRED03_084

تاریخ نمایه سازی: 18 تیر 1401

چکیده مقاله:

In the recent years, the regulators employ variousforms of reward/penalty schemes (RPS) in electric distributionnetworks to ensure the reliability of services. In the presence ofRPS, distribution system operators (DSOs) would be exposed tofinancial penalty if they cannot provide reliable service to thecustomers. This means that the uncertainty in the reliability ofservices shows itself in financial risk faced by DSO. In suchcircumstance, DSOs are induced to reinforce the reliability ofservice through reliability reinforcement projects such aspreventive maintenance (PM) projects. The maintenance projectsshould be managed in a way that the maximum profit can beobtained in the minimum risk. This study introduces risk-basedmaintenance management in the presence of RPS. Modeling thedependency of component failure rate on the preventivemaintenance (PM) expenditure is the core of risk-basedmaintenance management, and this paper introduces thegeneralized proportional failure rate model (GPFM) for thispurpose. This model together with the outage time generationalgorithm (OTGA) help us to determine the financial risk facedby DSO. To verify the proposed method, it was implemented inthe overhead line (OHL) feeders of a real distribution network.

کلیدواژه ها:

maintenance scheduling ، risk basedoptimization ، power distribution overhead line

نویسندگان

Amin Moradkhani

Ilam University Ilam, Iran

Mahmoud Reza Haghifam

Tarbiat Modares University Tehran, Iran

Mohammad Rahimkhani

Ilam Electrical Power Distribution CompanyIlam, Iran