Identigying the Factors Affecting Successful Delivery of Mega Projects: Case of London Olympic ۲۰۱۲
محل انتشار: دومین کنفرانس بین المللی حقوق ساخت
سال انتشار: 1400
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 219
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
ICLC02_050
تاریخ نمایه سازی: 12 اسفند 1400
چکیده مقاله:
The successful delivery of large-scale construction projects is an intention for almost every participating entity within the industry. However, planning and implementation of the major construction projects frequently lead to delayed completion, augmented associated costs and loss of opportunities and profit. While numerous circumstances and events are connected to the failure of construction projects, the study of the successful major projects and the review of their approach from the outset can be inspirational for fulfilling the objectives of future projects. By assessing the development legacy of the London Olympic Games ۲۰۱۲, this paper attempts to identify and highlight some of the criteria that participated in the successful delivery of the program of the Games. The review is expected to draw attention to the establishment of integrated processes from the outset to provide a dynamic response to the project requirements, changes, and uncertainties as they unveil throughout the life of the projects.
کلیدواژه ها:
نویسندگان
Sherry Seresht
BSc Civil Engineering, M.Sc. PM QUT (Current), MIEAust., MSCLAust., MPMI, MCMAA, Former Member of Construction Engineering Organization (Tehran)