Modeling, stress distribution and the change of ground behavior during excavation of Tehran city underground tunnel

سال انتشار: 1392
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 159

فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_JGEO-9-4_002

تاریخ نمایه سازی: 30 آبان 1400

چکیده مقاله:

From these factors the tunnel form, dimensions, depth, the tunnel drilling method, presence of water, etc. can be mentioned. Achieving an optimized design requires identification of effective parameters and the relationships among them. Effective design parameters include stability of the tunnel face, horizontal and vertical displacement, seismic wave, and shrinkage phenomenon, etc. Also considering the importance of the structural stability on the ground surface above the tunnel, especially in the urban tunnels, the settlement level of the ground surface must be considered. In this study the stability of an ۸m width and height horseshoe sectioned tunnel located in Tehran alluvium having been projected for water transmission has been technically analyzed using the FLAC ۲D software and the comparison wad made using empirical and analytical methods. The results showed that the maximum settlement resulting from design step using software is ۱۴.۹ mm which is almost consistent with the value obtained from the empirical relationship, and the difference estimation lies within the acceptable range (۰.۷%). Also the obtained horizontal displacement shows that the maximum displacement within the ۲۵m distance from the tunnel axis (on both sides) is ۲mm and the values obtained from the empirical relationship showed that the maximum horizontal displacement occurs on the ۲۵m distance from the tunnel axis.

نویسندگان

Naser Ebadati

Department of Geology, Islamshahr Branch, Islamic Azad University, Islamshahr, Iran

Mojtaba Kaboli

Zaminkav Research Center, Tehran, Iran