Tunnel Face Stability Analysis in Soft Ground in Urban Tunneling by EPB Shield (Case Study : 7th Line in Tehran Metro)

سال انتشار: 1390
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 2,262

فایل این مقاله در 9 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

ITC09_096

تاریخ نمایه سازی: 12 آذر 1390

چکیده مقاله:

Traffic congestion and environmental factors are creating a demand for greater utilization of underground spaces in urban areas. In mechanized excavation of subway tunnels, the Earth Pressure Balanced Shield (EPBS) has been developed in the recent decades for managing the instability of the excavation profile in complicated geotechnical conditions in urban areas. During the advancement of an EPBS, the face-stabilizing pressure is one of the most important factors of critical and principle to be evaluated correctly. In tunneling by EPBS, high face pressure often leads to surface upheaval whereas low face pressure leads to sudden collapse of the face and ultimately settlement of the surface. Both of these misevaluated pressures may cause the damages which followed by pert of time and finance. This paper is discussed about urban tunneling by EPBS in soft ground conditions and focused on calculation of face-stabilizing pressure applying to the case of 7th line in Tehran metro project. Face-support pressure is estimated by most current methods of limiting equilibrium analysis and limiting analysis in excavated parts (two stations) of direction with different and difficult geotechnical conditions. Obtained results compared to EPBS operational results which showed the results of Broere analytical method is most attractive and realistic among others. For one of the excavated stations calculated value of the Broere analytical method obtained 78.406 KPa and EPBS actual value was equal to 81.01 KPa. Due to results verification that illustrate a good adjustment with the actual values, quantity face-stabilizing pressure is predicted for some of the alignment unexcavated stations (S7, V7, W7 and X7) which can be used in built procedure. Maximum value was quantity 246.351 KPa for station V7 and minimum value obtained quantity 25.866 KPa for station W7.

کلیدواژه ها:

نویسندگان

J. Mohammadi

Department of Mining Engineering, Islamic Azad University Tehran South Branch, Iran,

K. Shahriar

Department of Mining, Metallurgy and Petroleum Engineering, Amirkabir University of Technology

P. Moarefvand

Department of Mining, Metallurgy and Petroleum Engineering, Amirkabir University of Technology

S Hosseini

Department of Mining Engineering, Islamic Azad University Tehran South Branch, Iran,

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • [_] .Mohammadi.J, (2010)."Tunnel Face Stability Analysis in Soft Ground by ...
  • . Guglielmetti.V, Grasso.P, Mahtab.A and Xu.Sh, (2007) ."Mechanized Tunnelling in ...
  • . Broere.W, (2001). Tunnel Face Stability & New CPT Applications, ...
  • . Broere.W, (2002). " Influence of excess pore pressures on ...
  • . Lece.E & Dormieux.L, (1990). "Upper and lower Bound solutions ...
  • . Wang.H & Jia.J, (2009). :Face Stability Analysis of Tunnel ...
  • . Anagnostou.G & Kovari.K, (1993). "Face stability conditions with Earth- ...
  • نمایش کامل مراجع