Robust and Stable Flow Shop Scheduling Problem under Uncertain Processing Times and Machines’ Disruption

سال انتشار: 1400
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 273

فایل این مقاله در 13 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_IJE-34-4_020

تاریخ نمایه سازی: 6 اردیبهشت 1400

چکیده مقاله:

This paper presents a predictive robust and stable approach for a two-machine flow shop scheduling problem with machine disruption and uncertain job processing time. Indeed, a general approach is proposed that can be used for robustness and stability optimization in an m-machine flow shop or job shop scheduling problem. The robustness measure is the total expected realized completion time. The expected sum of squared aberration between each jobs’ completion time in the realized and initial schedules is the stability measure. We proposed and compared two methods to deal with such an NP-hard problem; a method based on decomposing the problem into sub-problem and solving each sub-problem, and a theorem-based method. The extensive computational results indicated that the second method has a better performance in terms of robustness and stability, especially in large-sized problems. In other words, the second method is preferable because of the better manufacturer responsiveness to the customer and the production staff satisfaction enhancement.

کلیدواژه ها:

نویسندگان

Z. Abtahi

Department of Industrial Engineering, College of Engineering, Shahed University, Persian Gulf Expressway, Tehran, Iran

R. Sahraeian

Department of Industrial Engineering, College of Engineering, Shahed University, Persian Gulf Expressway, Tehran, Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • 1.     Fuchigami, H. Y., and Rangel, S., "A survey of ...
  • 2.     Mokhtari, H., Molla-Alizadeh, S., and Noroozi, A., "Modelling and ...
  • 3.     Yazdi, M., Zandieh, M., and Haleh, H., "A Mathematical ...
  • 4.     Abtahi, Z., Sahraeian, R., and Rahmani, D., "A Stochastic ...
  • 5.     Pinedo, M. L., Scheduling, (2012), Boston, MA, New York: ...
  • 6.     Gupta, J. N. D., and Stafford, E. F., "Flowshop ...
  • 7.     Liao, W., and Fu, Y., "Min–max regret criterion-based robust ...
  • 8.     Drwal, M., and Józefczyk, J., "Robust min–max regret scheduling ...
  • 9.     Rahmani, D., "A new proactive-reactive approach to hedge against ...
  • 10.   Framinan, J. M., Fernandez-Viagas, V., and Perez-Gonzalez, P., "Using ...
  • 11.   Abtahi, Z., Sahraeian, R., and Rahmani, D., "A New ...
  • 12.   Mehta, S. V., and Uzsoy, R. M., "Predictable scheduling ...
  • 13.   Lee, J.-Y., and Kim, Y.-D., "Minimizing total tardiness in ...
  • 14.   Ma, S., Wang, Y., and Li, M., "A Novel ...
  • 15.   Liu, F., Wang, S., Hong, Y., and Yue, X., ...
  • 16.   Cui, W., Lu, Z., Li, C., and Han, X., ...
  • 17.   Shen, J., and Zhu, Y., "Uncertain flexible flow shop ...
  • 18.   Graham, R. L., Lawler, E. L., Lenstra, J. K., ...
  • 19.   Abedinnia, H., Glock, C. H., and Brill, A., "New ...
  • 20.   Rakrouki, M. A., Kooli, A., Chalghoumi, S., and Ladhari, ...
  • 21.   Rossi, F. L., Nagano, M. S., and Sagawa, J. ...
  • 22.   Ghezail, F., Pierreval, H., and Hajri-Gabouj, S., "Analysis of ...
  • 23.   Kasperski, A., Kurpisz, A., and Zieliński, P., "Approximating a ...
  • 24.   Katragjini, K., Vallada, E., and Ruiz, R., "Flow shop ...
  • 25.   Ying, K.-C., "Scheduling the two-machine flowshop to hedge against ...
  • 26.   Fazayeli, M., Aleagha, M.-R., Bashirzadeh, R., and Shafaei, R., ...
  • 27.   Pinedo, M., and Singer, M., "A shifting bottleneck heuristic ...
  • 28.   Shi, F., Zhao, S., and Meng, Y., "Hybrid algorithm ...
  • 29.   Koulamas, C., "A guaranteed accuracy shifting bottleneck algorithm for ...
  • 30.   Mukherjee, S., and Chatterjee, A. K., "Applying machine based ...
  • 31.   Elyasi, A., and Salmasi, N., "Stochastic flow-shop scheduling with ...
  • 32.   Allahverdi, M., and Allahverdi, A., "Minimizing total completion time ...
  • 33.   Abtahi, Z., Sahraeian, R., and Rahmani, D., "Predictive heuristics ...
  • 34.   Pinedo, M., "Optimal policies in stochastic shop scheduling", Annals ...
  • 35.   Nouiri, M., Bekrar, A., Jemai, A., Trentesaux, D., Ammari, ...
  • نمایش کامل مراجع