Moving to higher directional scheduling schemes
سال انتشار: 1399
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 282
فایل این مقاله در 17 صفحه با فرمت PDF قابل دریافت می باشد
- صدور گواهی نمایه سازی
- من نویسنده این مقاله هستم
استخراج به نرم افزارهای پژوهشی:
شناسه ملی سند علمی:
JR_IJNAO-10-1_009
تاریخ نمایه سازی: 17 فروردین 1400
چکیده مقاله:
A general overview of the scheduling’s literature of some researches shows that among various factors, the priority rules and also the structure of projects are two main factors that can be affected on the performance of multidirectional scheduling schemes. In addition, a variation on the number of directors in scheduling schemes (e.g., single directional, bi-directional, and tri-directional scheduling scheme) produces different makespans. However, the question of when to move from the single direction to the multidirectional scheduling schemes remained open. In this paper, based on analytical and also empirical results, we show that when availability and distributions of resource measures such as the number of peaks and number of overflows or the average amount of overflows are increased, higher directional scheduling schemes can be produced smaller makespans. Hence, in the light of these resource measures, the multidirectional scheduling schemes can be reduced the dependency of the solution’s quality on the priority rules used.
کلیدواژه ها:
نویسندگان
Hamid Reza Yousefzade
Department of Mathematics, Payame Noor University (PNU), Iran.
Maryam Nasehi
Department of Mathematics, Payame Noor University (PNU), Iran.
مراجع و منابع این مقاله:
لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :