Comparison between Real and Calculated Values of Ground Settlement Corresponding to EPBM Tunneling for Esfahan Subway Project

  • سال انتشار: 1389
  • محل انتشار: چهارمین همایش بین المللی مهندسی ژئوتکنیک و مکانیک خاک ایران
  • کد COI اختصاصی: ICGESM04_038
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 2037
دانلود فایل این مقاله

نویسندگان

A Taheri

Managing Director, Zaminfanavaran Consulting Engineers (ZAFA), Esfahan, Iran

A. H Haghi

Geotechnical Consultant Engineer, Zaminfanavaran Consulting Engineers (ZAFA), Esfahan, Iran

چکیده

Recently by Growing the utilization of EPB machines in urban areas, the emphasis of estimation and prediction of the ground settlement has significantly increased. In this paper, first the tunnel face stability pressure for Esfahan metro line was calculated according to the Mohkam method. Then by creating a 3D numerical model using Plaxis 3D Tunnel software and applying these supporting face pressures to the tunnel crown, settlements were pre-calculated and the surface displacement was checked at all instrumentation stations. Finally the concluded amounts for displacement is compared by the outputs of extensometers and this comparison lead us to check the reliability of calculated minimum, average and maximum settlements and the accuracy of the designed tunnel face stability pressure.

کلیدواژه ها

tunnel face stability pressure, extensometers, settlements, EPB tunneling

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.