Solving economic lot scheduling problem using extended basic period approach with deteriorating items
- سال انتشار: 1389
- محل انتشار: هفتمین کنفرانس بین المللی مهندسی صنایع
- کد COI اختصاصی: IIEC07_067
- زبان مقاله: انگلیسی
- تعداد مشاهده: 2975
نویسندگان
Department of Industrial Management, Shahid Beheshti University
Department of Industrial Engineering,Mazandaran University of Science and Technology
چکیده
In this paper, we study economic lot scheduling problem (ELSP) in production environments with slack costs and deteriorating items using the extended basic period approach under Power-of-Two (PoT) policy. Our goal in this research is determining an optimal batch size for a product and minimizing total related costs to such a problem. The ELSP is concerned with the scheduling decision of n items and lot sizing. Also PoT policy ensures that the replenishment cycle of each item to be integer.کلیدواژه ها
Economic lot scheduling problem, Deterioration, Imperialist competitive algorithmمقالات مرتبط جدید
- افزایش قابلیت اطمینان تجهیز پمپ گهو واحد انحلال کارخانه آلومینای ایران-جاجرم با استفاده از تکنیک های FMEA و RCA
- TPM با پشتیبانی ۵S برای بهبود در دسترس بودن خط تولید در صنایع لبنی (مطالعه موردی: یکی از کارخانجات لبنی)
- بکارگیری نوآوری بهره ور در مدیریت دارایی های فیزیکی دفاعی
- مدیریت دارایی زیرساختهای قدیمی شرکت توزیع برق-تحلیل موردی
- تکنیک های آنالیز ارتعاشات و آنالیز روغن در عیب یابی کمپرسور
اطلاعات بیشتر در مورد COI
COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.
کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.