Applying System Approach to the Project Scheduling Problem

  • سال انتشار: 1391
  • محل انتشار: نهمین کنفرانس بین المللی مهندسی صنایع
  • کد COI اختصاصی: IIEC09_032
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 1723
دانلود فایل این مقاله

نویسندگان

Maliheh Majidzadeh

Alzahra University

Jafar Bagherinejad

Assistant Professor, Industrial Engineering Department

چکیده

In the real world, project scheduling problems are affected by complexity. Studying an NP-hard scheduling problem is a difficult task, particularly for the problems with high degree of size and complexity. Project scheduling problem is an inherently multi-objective problem since managers want to finish projects as soon as possible with the minimum cost and the maximum quality. In this paper we introduce the most common objective functions in the project scheduling problem. We try to provide a system approach to this problem in order to analyze factors and main objectives in interaction with each other. To reach this goal Vensim software is used to apply system approach to the problem. We propose a causal diagram to illustrate connections and a flow diagram for a selected problem. Finally, results of two scenarios proposed are analyzed

کلیدواژه ها

Project scheduling problem; system approach; factors and objectives; cuasal diagram; flow diagram

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.