Examining the important delay factors in construction projects in developing countries and examining the contribution of each factor

  • سال انتشار: 1401
  • محل انتشار: هفتمین کنفرانس بین المللی پژوهش در علوم و مهندسی و چهارمین کنگره بین المللی عمران، معماری و شهرسازی آسیا
  • کد COI اختصاصی: ICRSIE07_193
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 151
دانلود فایل این مقاله

نویسندگان

Seyed Abolfazl Razavi

Department of civil engineering, Faculty of Engineering, Shiraz University ofTechnology, Shiraz, Iran

چکیده

Successful implementation of construction projects and keeping them within the estimated cost and schedule depends on a method that requires engineering judgment. Despite the lack of interest from employers, contractors and consultants, many projects experience long delays, resulting in increased initial time and cost estimates. This problem is more evident in conventional contracts where the contract is awarded to the lowest bidder. The delay, slowness and lack of progress in urban construction projects, which cause the lack of sustainable urban management, indicate the existence of obstacles and root problems in the implementation of valuable urban plans, which seriously threaten the reconstruction and development of the urban space. Adopting new strategies for contracting, such as types of design-build and construction management (CM) contracts. Such contracts reduce delays by limiting owner involvement, improving design, and improving contractual relationships among all parts of the project.

کلیدواژه ها

project, construction, delays, cost, employer

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.