Hybrid exact method for resource constrained project scheduling problem

  • سال انتشار: 1389
  • محل انتشار: هفتمین کنفرانس بین المللی مهندسی صنایع
  • کد COI اختصاصی: IIEC07_008
  • زبان مقاله: فارسی
  • تعداد مشاهده: 1544
دانلود فایل این مقاله

نویسندگان

Hamid Reza Yoosefzadeh

Ferdowsi University of Mashhad

Hamed Reza Tareghian

Ferdowsi University of Mashhad

چکیده

A number of exact scheduling schemes incorporating various solution techniques such as branch and bound and dynamic programming exist for solving the well known resource constrained project scheduling problem. In this paper we report on a hybrid method which prominently depends on a branch and bound with a look-ahead mechanism as well as a genetic algorithm. Minimal delay set, core time, left shift are among the pruning rules used to prune inferior nodes of the enumeration tree. The proposed method has been verified and validated using a standard set of test problems with 30-120 requiring between 1-6 resource types each. The capability and applicability of the proposed method is demonstrated using standard problem instances

کلیدواژه ها

Project management, Branch and Bound algorithm, Genetic algorithm

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.