Identifying the requirements of project portfolio management processes

  • سال انتشار: 1396
  • محل انتشار: سیزدهمین کنفرانس بین المللی مدیریت پروژه
  • کد COI اختصاصی: IPMC13_002
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 731
دانلود فایل این مقاله

نویسندگان

Mahmoud Ershadi

Phd student, Construction Management, University of Newcastle, NSW, Australia

Mohammad Ali Arsanjani

Phd student in Management, Iran University of Science and Technology, Tehran, Iran

چکیده

Project portfolio management is considered as a holistic approach facilitateing the selection of the best projects, and monitor of their performance to make sure from their alignment with strategies. Without implementing such systematic approach, organizations face challenges in directing their projects and programs toward strategies. Regarding a research gap in studying the requirements of main project portfolio management processes. In this paper, the requirements of project portfolio management processes were identified through literature review and interviewing project management experts. At first, project portfolio management models and frameworks were reviewed, and the main processes were extracted. Then inputs and outputs of these processes were identified. The results of this research can provide a theoretical basis for proper executions of project portfolio management processes.

کلیدواژه ها

project portfolio management; process requirements, process inputs and outputs

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.