Analysis of maintenance systems with a special look at Falc software Case study of tunnel number 3 of the Haraz road

  • سال انتشار: 1396
  • محل انتشار: چهارمین کنفرانس بین المللی فناوری های نوین در مهندسی عمران،معماری و شهرسازی
  • کد COI اختصاصی: RCEAUD04_012
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 514
دانلود فایل این مقاله

نویسندگان

Alireza Afradi

Ph.D. Student of Mining Engineering, Qaemshahr Branch, Islamic Azad University,Qaemshahr, Iran

Siamak Rezazadeh

Assistant Professor and Head of the Department of Mining and Geology, Qaemshahr Branch, Islamic Azad University, Qaemshahr, Iran

چکیده

One of the most sensitive and important issues in the design and implementation of tunnels is due to the large amount of investment, the choice of the method of drilling and the choice of the type of maintenance system suitable for it. In this paper, the analysis of maintenance systems has been considered and the characteristics of the maintenance system have been considered and evaluated. The proposed Tunnel Fell Model is the result of the proposed maintenance systems for medium-heavy frames with a range of 1.1 to 1.6 and a wide bolt with a distance of 1.4 to 2.2 and a width of 20 cm with a thickness of 20 cm in the crown and the walls with the bolt of choice rock Became

کلیدواژه ها

distance, system, drilling

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.