New Generation of Inspection Robot for Transmission Lines using Renewable Energy

سال انتشار: 1394
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 1,815

فایل این مقاله در 11 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

WINDCONF07_013

تاریخ نمایه سازی: 16 خرداد 1394

چکیده مقاله:

For link power generations to industrial centers transmission lines must cross hundreds of kilometers. There are a large number of line sleeves, pylons, tension insulators in this way. The line sleeves on power transmission line connect two conductors while the transmission line is constructing. However, the line sleeves sometimes cause transmission line break down, because the line sleeves are deteriorated and decayed by natural factors such as firelight, acid rain and etc. When the transmission line is broken, the economic loss is huge. Therefore the line sleeves on power transmission lines should be inspected periodically to prevent power failure, to speed up inspection since 2002, over 20 inspection robots have been developed in the world. One of the most important factor in the transmission line robot was robot’s energy, this paper proposed a new generation of inspection robot for transmission lines which consist of propeller aircraft engine and photovoltaic (PV) array for feeding the electric servo motor and brushless DC motor. Propeller engine not only makes forward force but also by cooling PV array can be increased efficiency.

نویسندگان

s.m.reza tousi

Assistant Professor at Bu-Ali Sina University

peyman bayat

MSc Student at Bu-Ali Sina University

pezhman bayat

MSc Student at Bu-Ali Sina University

abbass fattahi meyabadi

Assistant Professor at Hamedan University of Technology

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Robotic Inspection Over Power Lines, " in Proc of the ...
  • D. I. Jones, and G. K. Earp, "Requirements for aerial ...
  • B. Avidar, "Electronic airborne inspection method for overhead transmission power-lines, ...
  • J. Katrasnik, F. Pernus and B. _ Survey of Mobile ...
  • D. Jones, :Power line inspection _ a UAV concept, " ...
  • P. Campoy, P. J. Garcia, A. Barrientos, J. d. Cerro, ...
  • B. Wang, , X. Chen, Q. Wang, L. Liu, H. ...
  • X. Xiao, G. Wu, H. Xiao, J. Dai, _ Inspection ...
  • P.Debenest, M.Guarnieri, K.Takita, E.Fukushima, S.Hirose, K.Tamura, A.Kimura, H.Kubokawa, N.Iwama and ...
  • S. Montambault, and N. Pouliot, :LineScout Technology: Development of an ...
  • Hongguang Wang, Fei Zhang, Yong Jiang, Guangjun Liu, Xiaojie Peng, ...
  • M. F. Ansari, S. Chatterji, and A. Iqbal, "A fuzzy ...
  • S. Brunton, C. Rowley, S. Kulkarni, and C. Clarkson, "Maximum ...
  • Ch. Abhilash, R. Shirisha, Khaja Rafi, "Analysis of Ful] Bridge ...
  • S. K. Kim, J. H. Joen, C. H. Cho, J. ...
  • F. Valenciaga and P. F. Puleston, "Supervisor control for a ...
  • G R Walker, "Evaluating MPPT Converter Topologies Using A MATLAB ...
  • clamped bidirectional flyback converter' , IEEE Trans. Actively؛ [18] Chen, ...
  • J. S. Lai and D. J. Nelson, "Energy management power ...
  • K. Yamamoto, E. Hiraki, T. Tanaka, M. Nakaoka, and T. ...
  • E. Hiraki, K. Yamamoto, T. Tanaka, T. Mishima, and M. ...
  • R. Li, A. Pottharst, N. Frohleke, and J. Bocker, "Analysis ...
  • H. Tao, A. Kotsopoulos, J. L. Duarte, and M. A. ...
  • Hiyama T, Kouzuma S, Imakubo T. Identification of optimal operating ...
  • Hiyama T, Kitabayashi K. Neural network based estimation of maximum ...
  • Sullivan CR, Powers MJ. A high-1 efficiency maximum power point ...
  • Wasynzczuk O. Dynamic behavior of a class of photovoltaic power ...
  • Mohammad l Moradi, S.M. Reza Tousi, Milad Nemati, N. Saadat ...
  • نمایش کامل مراجع