Verification of Insulation Coordination Completed by High-Voltage Testing on Site

  • سال انتشار: 1382
  • محل انتشار: هجدهمین کنفرانس بین المللی برق
  • کد COI اختصاصی: PSC18_182
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 1802
دانلود فایل این مقاله

نویسندگان

Hauschild

HIGHVOLT Prüftechnik Dresden GmbH Germany

Kübler

HIGHVOLT Prüftechnik Dresden GmbH Germany

چکیده

Insulation coordination of substation equipment, cables and power lines is usually verified by type and routine tests in factory. To guarantee the insulation coordination in service it is necessary to demonstrate that insulation of the equipment is without transportation faults and correctly assembled. This is usually done by HV tests on site. The paper informs about the general principles for HV on-site testing as they are prepared by the IEC Working 42.13 for a new part 3 of the IEC Standard 60060. As examples requirements and test equipment for onsite t esting of gas-insulated substations (GIS) and HV XLPE cables are described. Finally the relation between on-site testing before commissioning on the one hand and after repair or for diagnostic purposes are considered.

کلیدواژه ها

insulation coordination; type testing; routine testing; on-site testing; hv test equipment

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.