Evaluating design formulas of berm breakwater by means of physical modeling and in situ surveying: case study of Shahid Beheshti breakwater
- سال انتشار: 1391
- محل انتشار: نهمین همایش بین المللی مهندسی سواحل، بنادر و سازه های دریایی
- کد COI اختصاصی: ICOPMAS09_049
- زبان مقاله: انگلیسی
- تعداد مشاهده: 1180
نویسندگان
M.sc , Sahel Consulting Engineers
M.sc , Sahel Consulting Engineers
چکیده
Shahid Beheshti Port is located at the inner side of the south eastern Headland of Chabahar Bay. Development is planned to be completed in two separated phases. As the first part of portdevelopment project, existing breakwater shall be further extended about 1650m. Although this length would be sufficient for the next development phase, based on the breakwater design criteria, allowable overtopping discharge, is different for these two phases. So crown wall shallbe applied in the second phase of breakwater development for limiting the overtopping discharge. Since the quarry material is available in the vicinity of project area, the rubble mound breakwater with armor stone has been designed for the extension parts. Considering the highdesign waves, the conventional breakwater needs large heavy rocks. However the extraction, transportation and handling of rock is limited to access to quarry with appropriate quality of rockin the vicinity of project location and also availability of equipments with enough capacity. Therefore, with considering these limitations, Berm Breakwater has been selected as the best alternative. This type of breakwater has been allowed to be reshaped statically or dynamically and its dimensions are a function of acceptable extends of recession area. Although differentformulas have been proposed for determining the profile of reshaping, implementing them for the understudy breakwater with specific materials and hydrodynamic conditions might deal tounreliable results. In this project for verifying the design formula, 2D physical modeling tests have been implemented to ensure the structure workability under environmental condition. Presently 3D modeling is going to be performed. In addition to evaluation the stability ofbreakwater and determining the recession profile, overtopping discharge has been also measured and it is compared with available design formulas. It shall be noted that the existing breakwater is also berm type breakwater and has been built with similar material. So it would be possible tomonitor the reshaped profiles under wave events that occurred the years after construction of breakwater. To sum up, three different sources are available to be compared and the best one can be judged here: Values by design formulas, surveying the recession of existing breakwater and performed physical modeling tests. In this paper, these methods and their results are presented.کلیدواژه ها
Berm breakwater, Physical modeling, Recession, Armor Stability, Overtoppingمقالات مرتبط جدید
- آمایش انرژی شهری وUBEM: چارچوبی برای تصمیم سازی پروتوتایپ محور
- معماری، عمران شهرسازی و مدیریت آن از دیدگاه اسلام و ایران بعد از انقلاب اسلامی
- بررسی کاربرد و اهمیت BIM در راستای بهبود فعالیت های عمرانی
- تحلیل طرح آمایش سرزمین در عمران، آبادانی شهرسازی و مدیریت محیط زیست در دوران انقلاب اسلامی؛ چالش ها و راهکارها
- آموزش حفاظت از محیط زیست در جمهوری اسلامی ایران: ضرورت ها و زمینه ها
اطلاعات بیشتر در مورد COI
COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.
کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.