After the occurrence of blackouts the most important subject is that how fast the electric service is restored. Power system restoration is an immensely complex issue and there should be a plan to be executed within the shortest time period. This plan has three main stages of black start, network reconfiguration and load restoration. In the black start stage, operators and experts may face with several problems; for instance, the unsuccessful connection of the long high voltage transmission line connected to the electrical source. In this situation, the generator may be tripped because of the unsuitable setting of its line charging mode or high absorbed reactive power. In order to solve this problem, the line charging process is defined as a nonlinear programming problem, and it is optimized by using MATLAB software in this paper. Therefore, the line charging mode of a hydro power plant is defined as an optimization problem. A nonlinear programming problem with considering the effect of transmission line parameters and installed shunt reactors in sending and receiving end buses is formulated. An iterative procedure is applied for solving the proposed problem. The optimized process is performed on a small part of a large grid which includes a ۲۵۰ MW hydroelectric unit and a ۴۰۰ KV transmission system. Simulations and field test results show the effectiveness of the optimal planning.

نویسندگان

Mohammad Esmaili

Deputy of Operation, Esfahan Regional Electric Company, Isfahan, Iran

Ehsan Heydarian-Forushani

Department of Electrical and computer engineering, Qom University of Technology, Qom, Iran