Identification and evaluation of social risks in industrial-civil megaprojects with the help of multi-criteria decision-making techniques and system dynamics

  • سال انتشار: 1403
  • محل انتشار: مجله آنالیز غیر خطی و کاربردها، دوره: 15، شماره: 10
  • کد COI اختصاصی: JR_IJNAA-15-10_022
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 180
دانلود فایل این مقاله

نویسندگان

Seyed Amin Seyedi

Department of Civil Engineering, Yazd Branch, Islamic Azad University, Yazd, Iran

Alireza Mirjalili

Department of Civil Engineering, Yazd Branch, Islamic Azad University, Yazd, Iran

Mahoudreza Maheri

Department of Civil Engineering, Shiraz University, Shiraz, Iran

Abolfazl Sadeghian

Department of Industrial Management, Yazd Branch, Islamic Azad University, Yazd, Iran

چکیده

Megaprojects play an important role in economics, society, and the environment and during recent years have fast developed. However, due to frequent social involvement induced by the social impact, social risk control has become a big challenge. So, this study is based on the systematic analysis of social risks and behavioural models in megaprojects. This study proposed a model composed of multi-criteria decision-making techniques and system dynamics to analyze the social risks for megaprojects. After choosing the desired risks in the social dimension and obtaining the causal relationships through the DEMATEL-ANP (DANP) method, as seen in the chart, the relationships between the extant variables can be investigated and concluded. The results show that some risks including timely completion of the project and related issues regarding increasing time based on social problems, the extreme internal and external dissatisfaction of megaprojects, and the decreasing risk due to increasing cost are ranked the first, second, and third one, respectively. Also, the extreme internal and external dissatisfaction of the megaproject has the most impact. In this proposed model, the factors affecting the risk related to the timely completion of the project and associated issues regarding the increasing time can be investigated in such a way that the values of this parameter have increased because of an increase in the internal variables, and vice versa. The mutual impact of the variable, the extreme internal and external dissatisfaction of the megaproject, the decreasing risk of the project quality due to excessive increasing cost in terms of social and unpredicted issues, and social interventions of beneficiaries on the timely completion risk of the project and issues of increasing time can be observed. Also, in the below charts, the behaviour of this model has been investigated during ۱۰ coming years by different scenarios. This study can facilitate the perception of social risk in terms of the risk evolution and provide the decision-making support to overcome the social risk with megaproject operation.

کلیدواژه ها

Project, Megaproject, Risk, Social risk, DEMATEL-ANP, DANP, System Dynamics

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.