Railway Station Construction Methods
- سال انتشار: 1402
- محل انتشار: سومین کنفرانس بین المللی پژوهش ها و دستاوردهای نو در علوم، مهندسی و فناوری های نوین
- کد COI اختصاصی: SETBCONF03_051
- زبان مقاله: انگلیسی
- تعداد مشاهده: 165
نویسندگان
Associate Professor, Department of Railway Engineering and Transportation Planning,Faculty of Civil Engineering and Transportation, University Isfahan, Isfahan, Iran
Amir Hossein Tabbakhpour Langeroodi
M.Sc., Transportation Engineering and Planning, Department of Transportation, Faculty ofCivil Engineering, Iran University of Science and Technology, Tehran, Iran
M.Sc., Construction Engineering and Management, Department of Structure Engineering,Faculty of Civil Engineering, Iran University of Science and Technology, Tehran, Iran
چکیده
Construction, execution, and implementation are known as the most time-consuming, costly, and difficult steps in the life cycle of a project. The direct and indirect impact of the project's progress on the implementation method and process doubles the importance of this step, and in certain projects such as railway stations, which are sometimes not possible with conventional construction methods and require the use of special methods, It will have higher sensitivity. The financial and time cost above this, the step in railway station projects, which are usually known as large structures, is so significant that the smallest change in the construction method can save significant amounts or exceed the expected costs. impose a project. Therefore, the selection of the appropriate construction and implementation method for the station should be done according to the conditions of each project. Therefore, one of the most important variables that make a significant difference in the choice of the construction method is the issue of the height of the station compared to the ground level. In this article, focusing on this factor, the stations are classified and the proper construction method of each station is appropriate. It is offered at any height level. Also, referring to the limiting factors of the project such as existing machinery and equipment, project time, project cost, space availability, and type and location of the station, it is tried to make a decision regarding the choice of the right method for the construction, implementation, and implementation of road stations. Explain iron in different conditions.کلیدواژه ها
Railway Station, Construction methods, Railway Engineering, Construction Managementمقالات مرتبط جدید
- تحلیل چالشها و راهکارهای تقویت ارتباط دانشگاه و صنعت: با تمرکز بر حلقههای مفقوده
- بازخوانی نقش دانشگاه و صنعت در توسعه ملی: از موانع تا راهکارها
- نشانگر تشخیصی جدید در ژن C-myc به عنوان کیت غیر تهاجمی تشخیص سرطان دهان
- برنامه ریزی منابع تجدید پذیر با درنظر گرفتن برنامه ریزی توسعه انتقال و تولید منابع توان راکتیو
- برنامه ریزی همزمان توسعه انتقال و منابع تولید توان راکتیو با استفاده از یک الگوریتم تکاملی بهبود یافته
اطلاعات بیشتر در مورد COI
COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.
کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.