Optimal day-ahead scheduling of VPP considering demandresponse programs
- سال انتشار: 1402
- محل انتشار: دوازدهمین کنفرانس ملی مهندسی برق مجلسی
- کد COI اختصاصی: NCEEM12_019
- زبان مقاله: انگلیسی
- تعداد مشاهده: 74
نویسندگان
MAPNA Electric and Control, Engineering & Manufacturing Co. (MECO), MAPNA Group
چکیده
This paper presents an economic framework for the virtual power plant (VPP) to participate in joint energy andregulation markets. Differnet electricity consumers and wind turbine are aggregated in the proposed VPP model. VPPpersuades its consumers to provide regulation reserve by signing incentive agreement. A scenario tree is applied tomodel uncertain parameters including energy and regulation prices, wind turbine (WT) production, regulation reservecalling probabilities and consumer behaviors. Two different case studies are presented to demonstrate robustness ofscheduling frameworkکلیدواژه ها
Virtual power plant, Regulation reserve, Demand response programs, Electricity consumersمقالات مرتبط جدید
- طبقه بندی تومورهای مغزی از تصاویر MRI با شبکه کانولوشن و روش های آموزش انتقال
- افزایش راندمان یک مبدل ترکیبی توان بالا با استفاده از تکنیک ZCT در عملیات سوئیچینگ نرم
- GNRFET-based Voltage Controlled Ring Oscillator Using GDI NAND Gate
- مقابله با اثرات جدا شدنی ناگهانی توربین گازی از شبکه سراسری، با استفاده از سیستم فازی ریزش بار بر پایه شبکه عصبی
- پیاده سازی الگوریتم دومینو برای حل مسائل بهینه سازی عمومی
اطلاعات بیشتر در مورد COI
COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.
کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.