FUZZY LEAD TIME APPLICATION TO MATERIAL REQUIREMENT PLANNING
- سال انتشار: 1384
- محل انتشار: چهارمین کنفرانس ملی مهندسی صنایع
- کد COI اختصاصی: IIEC04_163
- زبان مقاله: انگلیسی
- تعداد مشاهده: 2397
نویسندگان
Industrial Engineering department, Shiraz Azad Islamic University, Shiraz, Iran
چکیده
Material requirement planning (MRP) is used as important technique into production planning topics and several researches have done around it, but in the case of fuzzy lead time there are few researches available in the literature. In this paper fuzzy lead-time is discussed to cover uncertainty condition in MRP systems. Hereby, history of vendor delivery and volume of order are considered as inputs, and lead-time is defined as out put of the proposed fuzzy system. Finally, based on some linguistic rules (that are logical relationship between inputs and output) and generating fuzzy rule base, lead- time is estimated. The numerical example is given to demonstrate superiority of the designed proposed system.کلیدواژه ها
Fuzzy lead time, Material requirement planning, linguistic rulesاطلاعات بیشتر در مورد COI
COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.
کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.