A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times

  • سال انتشار: 1391
  • محل انتشار: هشتمین کنفرانس بین المللی مهندسی صنایع
  • کد COI اختصاصی: IIEC08_009
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 1891
دانلود فایل این مقاله

نویسندگان

Leila Emami

Yazd University

Mohammad bagher fakhrzad

Y azd University

چکیده

This paper presents a new mathematical model for a hi-objective job shop scheduling problem with sequencedependent setup times that minimizes the weighted meancompletion time and the weighted mean tardiness time. For solving this multi-objective motkl, we develops a fuzzy multiobjectivelinear programming (FMOLP) motkL In this problem, a proposed FMOLP method is applied with respect to the overall acceptable tkgree of the decision maker (DM) satisfaction.Finally, a numerical example demonstrates the feasibility of applying the proposed model to job shop scheduling with set uptimes problem. The proposed model yields a compromised solution and tlte decision maker's overall levels of satisfaction

کلیدواژه ها

Scheduling;Job shop;Sequence-dependent setup times; Mulu-objective linear programming;Fuzzy multi-objective linear+A1programming

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.