CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Adaptive Project Monitoring and Control with Variable Reviewing Intervals

عنوان مقاله: Adaptive Project Monitoring and Control with Variable Reviewing Intervals
شناسه ملی مقاله: JR_IJIEN-1-4_003
منتشر شده در در سال 1400
مشخصات نویسندگان مقاله:

Seyed Taha Hossein Mortaji - PhD., Iran University of Science and Technology, Industrial Engineering Department, Tehran, Iran.
Siamak Noori - Associate Professor, Industrial Engineering Department, Iran University of Science and Technology, Tehran, Iran
Morteza Bagherpour - Assistant Professor, Industrial Engineering Department, Iran University of Science and Technology, Tehran, Iran

خلاصه مقاله:
This paper presents a managerial project control scheme in which the time between the control points is not fixed but instead is a function of the distance between the planned and the current performance levels. Varying the reviewing interval improves the efficiency of the project monitoring and control process and allows project managers to obtain the required information more quickly. To evaluate the effectiveness of the proposed scheme, a systematic computational experiment is carried out. Besides, a practical case study is given to illustrate the applicability of the proposed scheme. The results reveal the satisfactory performance of the adaptive control scheme.

کلمات کلیدی:
Statistical Project Control, Variable Reviewing Intervals, Adaptive Control Points, Earned Value Management, Project Monitoring and Control

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/1577316/