CIVILICA We Respect the Science
(ناشر تخصصی کنفرانسهای کشور / شماره مجوز انتشارات از وزارت فرهنگ و ارشاد اسلامی: ۸۹۷۱)

Modeling Effective Indicators of Construction Projects Using Fuzzy TOPSIS Method

عنوان مقاله: Modeling Effective Indicators of Construction Projects Using Fuzzy TOPSIS Method
شناسه ملی مقاله: SASTECH05_100
منتشر شده در پنجمین کنفرانس بین المللی پیشرفت های علوم و تکنولوژی در سال 1390
مشخصات نویسندگان مقاله:

S Nemati - QIAU’s member of Scintific Assembly
A Yavari - QIAU’s student of Civil Engineering
S Shirafkan - QIAU’s student of Master of Bisuness Administration
S Bashirzadeh

خلاصه مقاله:
Recently growing rate of construction projects caused to expanse of construction industries.Unfortunately recent increasing demand on construction projects caused projects which do not matchappropriately with construction industry's approaches and this caused delays in a part and sometimes whole of the projects. This will take into consideration when we understand that a large amount of national expenditures includes construction projects costs. These delays cause damages intoinfrastructure. Recently using fuzzy methods and multiple attribute decision making have become usual for help of managing and efficiency construction in worldwide .these methods are based on fundamental indicators by putting them in phase category and grading them decision making is done. Thus this paper surveys and explains four common approaches in construction projects and finally by using fundamental indicators in project delays these approaches will be graded by Fuzzy TOPSIS methods and Multiple Attribute Decision Making (MADM).

کلمات کلیدی:
construction project, delays, multiple attribute decision making (MADM), TOPSIS

صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/157410/