Modeling Effective Indicators of Construction Projects Using Fuzzy TOPSIS Method

  • سال انتشار: 1390
  • محل انتشار: پنجمین کنفرانس بین المللی پیشرفت های علوم و تکنولوژی
  • کد COI اختصاصی: SASTECH05_100
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 1500
دانلود فایل این مقاله

نویسندگان

S Nemati

QIAU’s member of Scintific Assembly

A Yavari

QIAU’s student of Civil Engineering

S Shirafkan

QIAU’s student of Master of Bisuness Administration

S Bashirzadeh

چکیده

Recently growing rate of construction projects caused to expanse of construction industries.Unfortunately recent increasing demand on construction projects caused projects which do not matchappropriately with construction industry's approaches and this caused delays in a part and sometimes whole of the projects. This will take into consideration when we understand that a large amount of national expenditures includes construction projects costs. These delays cause damages intoinfrastructure. Recently using fuzzy methods and multiple attribute decision making have become usual for help of managing and efficiency construction in worldwide .these methods are based on fundamental indicators by putting them in phase category and grading them decision making is done. Thus this paper surveys and explains four common approaches in construction projects and finally by using fundamental indicators in project delays these approaches will be graded by Fuzzy TOPSIS methods and Multiple Attribute Decision Making (MADM).

کلیدواژه ها

construction project, delays, multiple attribute decision making (MADM), TOPSIS

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.