A New Approach in Joint Optimization of Maintenance Planning, Process Quality and Production Scheduling
- سال انتشار: 1393
- محل انتشار: فصلنامه بین المللی تحقیقات در مهندسی صنایع، دوره: 3، شماره: 2
- کد COI اختصاصی: JR_RIEJ-3-2_003
- زبان مقاله: انگلیسی
- تعداد مشاهده: 118
نویسندگان
Department of Industrial Engineering, KHATAM Institute of Higher Education, Tehran, Iran
Department of Industrial Engineering, University of Alzahra, Tehran, Iran
چکیده
Shop floor performance has great influence on performance of a manufacturing system. Traditionally, shop floor operational policies concerning maintenance scheduling, quality control and production scheduling have been considered and optimized independently. Anyway, these aspects of operations planning have an interaction effect on each other significantly and hereupon for improving the system performance; they need to be considered commonly. The main objective of this study is to provide a new approach in the quality control process. x control chart has been used in previous models, but in this study to improve the quality and increase the accuracy, cumulative sum control chart which is useful for detecting small changes by considering previous information of process is used and causes ۵% improvement in objective function in the case that x control chart was used.کلیدواژه ها
Production scheduling, Process quality, PM, Integration modelاطلاعات بیشتر در مورد COI
COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.
کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.