An ERP Selection Framework in Constructor Companies using Fuzzy AHP Approach
عنوان مقاله: An ERP Selection Framework in Constructor Companies using Fuzzy AHP Approach
شناسه ملی مقاله: JR_JITM-5-2_006
منتشر شده در در سال 1392
شناسه ملی مقاله: JR_JITM-5-2_006
منتشر شده در در سال 1392
مشخصات نویسندگان مقاله:
محمد علی شاه حسینی - Assistant Prof., Dep. of Management, Tehran University, Tehran, Iran
سعید روحانی - Assistant Prof., Dep. of Industrial Engineering, Firoozkooh Branch, Islamic Azad University, Tehran, Iran
بهار روحی - M.Sc. Student in Information Technology Management, MehrAlborz University, Tehran, Iran
خلاصه مقاله:
محمد علی شاه حسینی - Assistant Prof., Dep. of Management, Tehran University, Tehran, Iran
سعید روحانی - Assistant Prof., Dep. of Industrial Engineering, Firoozkooh Branch, Islamic Azad University, Tehran, Iran
بهار روحی - M.Sc. Student in Information Technology Management, MehrAlborz University, Tehran, Iran
The success in ERP implementation is definitely based on selecting an appropriate system which is more aligned with enterprise culture, infrastructure and requirements, and that's why ERP selection, the process and impressive criteria have been increasingly attended in recent years. The constructor companies are strongly affected by ERP systems. A successful implementation will improve their productivity and promote their performance considerably. However, it is a challenge for decision-makers to identify the real needs, define the criteria, select the acceptable vendor and purchase the most appropriate system. This study is developed to present a Fuzzy AHP-based framework for selecting ERP systems in constructor companies. In this study, the impressive criteria have been collected by reviewing previous studies and researches, a questionnaire was used to assess and define the criteria and sub-criteria’s priority. Afterward, another questionnaire was used to compare the alternatives regarding to each criteria. Eventually, the Fuzzy Analytic Hierarchical Process was used to select a system which is more aligned with the organization’s requirements and strategies
کلمات کلیدی: Enterprise Resource Planning System Selection, Fuzzy Analytic Hierarchical Process, Contractor Construction Company
صفحه اختصاصی مقاله و دریافت فایل کامل: https://civilica.com/doc/1401096/