Lali Bridge Caisson Foundation Interface Stresses

سال انتشار: 1390
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 967

فایل این مقاله در 9 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

NCHP03_818

تاریخ نمایه سازی: 3 فروردین 1391

چکیده مقاله:

The design of Lali Bridge caisson foundation with emphasis on interface stresses is presented in this paper. This bridge is on Karoon River. After impounding of theGotvand Dam the elevation of water in the river will reach 240 m. Before impoundment the river elevation was at 110 meters. Now after partial impounding theelevation of the river is at 140 m. This cable stay bridge has two piers each having two caissons foundations. The deck of the caissons is 13 by 32 meters and has a thicknessof 5 meters. The caissons are of 10 meter diameter and have a depth of 20 meters in the rock. The caisson has reinforced concrete, one meter thick at the periphery and 3meters thick at the bottom. The infilling is with fill concrete. The different stages of thecaisson foundation design are reviewed here with emphasis on the interface stresses between the caisson and the surrounding rock.

نویسندگان

A. Ghahramani

Prof of Civil Engineering department, Shiraz University, Shiraz, Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Ghahramani, Arsalan (2008), "Design of Abutmet and Pier Caissons of ...
  • Ghahramani, Arsalan (2009), "Static and Dynamic analysis of Lali bridge ...
  • Ghahramani, Arsalan (2010) "Load transfer and factor of safety of ...
  • Ghahramani, Arsalan (2011), " Lali Bridge Caisson Foundation", 6th International ...
  • نمایش کامل مراجع