Numerical Modeling to Optimize Construction Sequences of Karun 3 Powerhouse Cavern

  • سال انتشار: 1390
  • محل انتشار: اولین کنفرانس بین المللی و سومین کنفرانس ملی سد و نیروگاههای برق آبی
  • کد COI اختصاصی: NCHP03_587
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 1481
دانلود فایل این مقاله

نویسندگان

Reza Jamshidi Chenari

Dept of Civil Engineering, Guilan University, Rasht,Iran

Mohammad Hadi Sadaghiani

Deptof Civil Engineering, Sharif University of Technology, Tehran, Iran

چکیده

Underground hydropower projects consist of complex underground spaces. Usually the powerhouse caverns are the largest and the most complex part of these spaces.The excavation and supporting sequences of these caverns are crucial from technical, construction and economical point of view. It is necessary to control the stability ofthese spaces and analyze displacements and stress distribution as the excavation proceeds. Large underground caverns of Karun 3 Dam and hydro project werestudied in this research. Karun 3 project is one of the major hydro projects in Iran.The geology of the dam site includes Asmari and Pabdeh formations, consisting of limestone and marly limestone. There are five instrumentation stations along thehydropower cavern. Instruments were multiple point borehole extensometers (MPBX) and load cells. A two dimensional distinct element modeling was used for theseanalyses. The powerhouse cavern, the transformer cavern and the inlet valve gallery were modeled along with the major discontinuities. Six patterns of excavationsequences were selected to be analyzed. These patterns consist of 6-, 14- and 18-partexcavation sequences with variable width of excavated spaces. The results of the stability analyses show that a pattern with 18-part excavation sequences has thelowest displacement values around the excavation, thus causing the most stable condition. Considering the ease of construction, the model with lower number ofexcavated parts is preferred. Therefore, the pattern with 14-part excavation sequences which also has low displacement values around the excavation was chosen as theoptimum pattern for construction.

کلیدواژه ها

Karun 3 Dam, Powerhouse Cavern, Numerical modeling, Construction sequences, Optimization

مقالات مرتبط جدید

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.