DEM Response Analysis of Buried Pipelines Crossing Faults and Proposal for a Simplified Method to Estimate Allowable Fault Displacements

  • سال انتشار: 1386
  • محل انتشار: فصلنامه زلزله شناسی و مهندسی زلزله، دوره: 8، شماره: 4
  • کد COI اختصاصی: JR_JSEE-8-4_002
  • زبان مقاله: انگلیسی
  • تعداد مشاهده: 121
دانلود فایل این مقاله

نویسندگان

Yasuko Kuwata

Dept. of Civil Engineering, Kobe University

Shiro Takada

Dept. of Civil Engineering, Kobe University

Radan Ivanov

Dept. of Civil Engineering, Kobe University

چکیده

This paper investigates the behavior of polyvinyl chloride and ductile iron pipelines in relation to surface fault displacements using the Discrete Element Method (DEM) and proposes a method to estimate the allowable fault displacements. When modeling pipes and joints, the nonlinear material properties and joint characteristics (allowing detachment at the joints) are considered. Under a given set of various conditions with respect to pipe material, pipe diameter, crossing location and crossing angle, the allowable fault displacement to reach failure of the pipe is numerically simulated. The results show that a narrow angle between the fault line and the pipeline presents unsafe condition for the pipeline behavior. Furthermore, a simplified formula to estimate the allowable fault displacement is proposed, which considers joint failures due to axial forces. Estimated results achieved by this formula agree with the results obtained by numerical simulation. Finally, measures for installing pipelines with high performance joints are considered and discussed.

کلیدواژه ها

Discrete Element Method, Fault Displacement, Buried Pipeline, Response Analysis

اطلاعات بیشتر در مورد COI

COI مخفف عبارت CIVILICA Object Identifier به معنی شناسه سیویلیکا برای اسناد است. COI کدی است که مطابق محل انتشار، به مقالات کنفرانسها و ژورنالهای داخل کشور به هنگام نمایه سازی بر روی پایگاه استنادی سیویلیکا اختصاص می یابد.

کد COI به مفهوم کد ملی اسناد نمایه شده در سیویلیکا است و کدی یکتا و ثابت است و به همین دلیل همواره قابلیت استناد و پیگیری دارد.