uncertainty in safety evaluation of concrete dams nw-ialad - preliminary findings (eu-network -integrity assessment of large concrete dams)

سال انتشار: 1384
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 952

فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

SUADE01_069

تاریخ نمایه سازی: 15 آبان 1390

چکیده مقاله:

The integrity and safety assessment of concrete dams plays an important role for the infrastructure of many states of the EU (European Union). However, the water reservoirs created by those dams are often considered as a potential hazard. The safety of these important structures is of great concern to the owners, operators and engineers as well as to the public. This was the motivation to establish a thematic network, which brings together government authorities, researchers and end users to conduct a state of the art review on the integrity and safety assessment practice for concrete dams. The thematic network NW-IALAD is funded by the European Commission and responds to the specific EU program promoting competitive and sustainable growth. The aims of the network are to compare and critically review the current practice of dam operation, maintenance, rehabilitation and of the safety assessment in different European countries and to conduct a systematic comparison of available models for the numerical simulation of the structural behavior of concrete dams (benchmarking). Based on the results of the state of the art review shortcomings and prevailing deficits are pointed out. Preliminary results show the need for improvement. Suggestions for future plans and strategies apt to enhance the current practice are developed. The results of the NW-IALAD outcome can be differentiated into several topics: Dam operation, maintenance, repair and incidents Dam surveillance and dam performance Numerical tools for the simulation of concrete dams and dam foundation under several load conditions

نویسندگان

R. GAISBAUER

Expert - Verbund - AHP (Verbund - Austrian Hydro Power AG), Wien, Austria

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Dam Surveillance Practice (2005), 2" Eperts Seminar, Kaprun, Austria, 30 ...
  • Feist, C., , Kerber, W., Lehar, H. & Hofstetter, G. ...
  • ICOLD (1994), "Ageing of Dams and Appurtenant Works", Bulletin 93. ...
  • NW-IALAD web site (2005), EU Network, NW-IALAD (Integrity Assessment of ...
  • Papadrakakis, M. & Papadopoulos, v. (1996), :Robust and efficient solution ...
  • نمایش کامل مراجع