Developing a Risk Management Model for Banking Software Development Projects Based on Fuzzy Inference System

سال انتشار: 1399
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 568

فایل این مقاله در 12 صفحه با فرمت PDF قابل دریافت می باشد

این مقاله در بخشهای موضوعی زیر دسته بندی شده است:

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_JOIE-13-2_019

تاریخ نمایه سازی: 26 شهریور 1399

چکیده مقاله:

Risk management is one of the most influential parts of project management that has a major impact on the success or failure of projects. Due to the increasing use of information technology (IT) systems in all fields and the high failure rate of IT projects in software development and production, it is essential to effectively manage these projects is essential. Therefore, this study is aimed to design a risk management model that seeks to manage the risk of software development projects based on the key criteria of project time, cost, quality and scope. This is presented after making an extensive review of the literature and asking questions from experts in the field. In this regard, after identifying the risks and defining them based on the dimensions and indicators of software development projects, 22 features were identified to evaluate banking software projects. The data were collected for three consecutive years in the country s largest software development eco-system. According to Rough modelling, the most important variables affecting the cost, time, quality and scope of projects were identified and the amount of risk that a project may have in each of these dimensions was shown. Since traditional scales cannot provide the accurate estimation of project risk assessment under uncertainty, the indexes were fuzzy. Finally, the fuzzy expert system was designed by MATLAB software that showed the total risk of each project. To create a graphical user interface, the MATLAB software GUIDE was used. The system can predict the risks of each project before each project begins and helps project managers be prepared to deal with these risks and consider ways to prevent the project from failing. The results showed that quality and time risks were more important than cost and scope risks and had a greater impact on total project deviation.

نویسندگان

tooraj karimi

Faculty of Management and Accounting,university of tehran college of farabi,iran ,ghom

mohammadreza Fathi

faculty of manmagment and accounting,university of tehran college of farabi,iran,ghom

yalda yahyazade

factualty of Managment and Accounting,university of tehran college of farabi,iran,ghom

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Addison, T. (2003). E-commerce project development risks: evidence from a ...
  • Aqlan, F., & Lam, S. (2015). A fuzzy-based integrated framework ...
  • Arish, A. A. M., & Seyedesfahani, M. M. (2010). Model-based ...
  • Arnuphaptrairong, T. (2011). Top ten lists of software project risks: ...
  • Boehm, B. W. (1991). Software risk management: principles and practices. IEEE ...
  • Boehm, B. (1989). Software risk management. In European Software Engineering Conference (pp. ...
  • Chapman, Ch., & Ward, S. (2011). How to manage project opportunity ...
  • Chen, W., Liu, K., Su, L., Liu, M., Hao, Zh., ...
  • Chatterjee, S., Maji, B., & Pham, H. (2019). A fuzzy ...
  • Dokas, I. M., Karras, D., A., & Panagiotakopoulos, D. C. ...
  • A Grey-Based Fuzzy ELECTRE Model for Project Selection [مقاله ژورنالی]
  • Foong, K. Ch., Chee, Ch. T., & Wei, L. S. ...
  • Ford, F. N. 1985. Decision support systems and expert systems: ...
  • A New Fuzzy Stabilizer Based on Online Learning Algorithm for Damping of Low-Frequency Oscillations [مقاله ژورنالی]
  • Han, W. M., & Huang, S. (2007). An empirical analysis ...
  • Hadjimichael, M. (2009). A fuzzy expert system for aviation risk ...
  • Jamshidi, A., Yazdani-Chamzini, A., Yakhchali, S. H., & Khaleghi, S. ...
  • Lee, E., Park, Y., & Shin, J. G. (2009). Large ...
  • Makui, A., Gholamian, M.R., Mohammadi, S.E. (2016). A Hybrid Intuitionistic ...
  • An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment [مقاله ژورنالی]
  • Mohammadipour, F., & Sadjadi, S. J. (2016). Project cost–quality–risk tradeoff ...
  • Mousavi, S. M., Raissi, S., Vahdani, B., & MOJTAHEDI, SEYED ...
  • Muriana, C., Vizzini, G. (2017). Project risk management: A deterministic ...
  • Nourian, R., Mousavi, S. M., and Raissi, S. (2019). A ...
  • PMI. (2013). Project Management Body of Knowledge (PMBOK). 5thEd. Project ...
  • Pimchangthong, D., & Boonjing, V. (2017). Effects of Risk Management ...
  • Paré, G., Sicotte, C. Jaana, M., & Girouard, D. (2008, ...
  • Pourjavad, E., & Shahin, A. (2018). The application of Mamdani ...
  • Ropponen, J., & Lyytinen, K. (2000). Components of software development ...
  • Fuzzy Multi-Objective Linear Programming for Project Management Decision under Uncertain Environment with AHP Based Weighted Average Method [مقاله ژورنالی]
  • Song, H., & Jiang, J. (2016). Risks Identification in Embedded ...
  • Sonchan, P., & Ramingwong, S. (2014, May). Top twenty risks ...
  • Sumathi, S., & Paneerselvam, S. (2010). Computational intelligence paradigms: theory & ...
  • Shrivastava, S. V., & Rathod, U. (2017). A risk management ...
  • Schmidt, R., Lyytinen, K., Keil, M., & Cule, P. (2001). ...
  • Wallace, L., & Keil, M. (2004). Software project risks and ...
  • Zhang, Y., & Fan, Z. P. (2014). An optimization method ...
  • نمایش کامل مراجع