Risk management system for integrated innovation system with fuzzy -cut in a petrochemical unit

سال انتشار: 1398
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 364

فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IIEC16_264

تاریخ نمایه سازی: 12 مرداد 1399

چکیده مقاله:

Innovation and its acceptance in an organization are competitive advantages. Therefore, deploying innovation system in organizations can greatly help in adapting innovation and progress of organizations. Using software systems increases speed and accuracy of organization s activities, such a system is expected to be introduced into a software platform, so project will include two parts: system design and software platform development. Due to novelty of this project there is no information about such a project so in this article first work breakdown structure is extracted then by applying triangular and trapezoidal fuzzy functions on activity durations and considering -cuts, critical paths and completion time of this project will be extracted. It is calculated to reduce the risk of implementing such a project. Finally, proposed model is implemented in Marun petrochemical unit, and results is presented. This research is also applicable to other industrial units.

نویسندگان

Atie Karbasi

Master Student, Amirkabir University of Tehran /Industrial engineering

Reza Ramazani Khorshiddoust

Assistant professor, Amirkabir University of Tehran /Industrial engineering