Reliability and Risk Assessment of Electric Cable Shovel at Chadormalu Iron Ore Mine in Iran

سال انتشار: 1399
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 459

فایل این مقاله در 8 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_IJE-33-1_020

تاریخ نمایه سازی: 25 خرداد 1399

چکیده مقاله:

Nowadays, shovels play an important role in production of open pit mines and their failures result in significant production loss and considerable increase in maintenance costs. Therefore, reliability and risk analysis can help to improve production, productivity and reduce production costs. In this study, reliability of electric cable shovel of Chadormalu iron ore mine in Iran was investigated. Failure distribution function of the subsystems whose failure information is available was provided by statistical analysis using EasyFit 5.5, Minitab 18 and the subsystems with low or unavailable failure information which was generated by experts using normal distribution function. Criticality of subsystems was determined using Birnbaum and Fussell–Vesely importance measures reliability. Results showed that reliability of cable shovel has reached to zero after 40 hours and subsystems of crowd gearbox, swing gearbox, lubrication and bucket door are the most critical subsystems.

نویسندگان

Mohammad Hosein Basiri

Department of Mineral Exploration Engineering, University of Tarbiat Modares, Tehran, Iran

mohammad Reza sharifi

Department of Mineral Exploration Engineering, University of Tarbiat Modares, Tehran, Iran

Bakhtiar Ostadi

Department of Systems and Productivity Management, University of Tarbiat Modares, Tehran, Iran