INTER-RELATIONSHIP BETWEEN COST OVERRUN AND QUALITY OF PROVINCIAL PUBLIC SECTOR DEVELOPMENT PROJECTS (PSDP) ANALYZING DYNAMICS INVOLVED IN PROVINCIAL PROJECTS OF PUNJAB, PAKISTAN

سال انتشار: 1394
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 532

فایل این مقاله در 10 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

ICMEH02_024

تاریخ نمایه سازی: 16 شهریور 1395

چکیده مقاله:

Aim of Study This study aims to understand the relationship between cost overrun and quality within Public sector development projects (PSDP) executed in Punjab, Pakistan. Inter-relationship between cost and quality will explore the major and foremost factors affecting quality.Problem Statement Quality is one of the important aspect of all projects. Project success level is very much dependent on the quality performance. Public sector development projects are fronting with very thoughtful quality related issues, which lead to unsuccessful and incompetent projects in terms of cost-overrun, huge level rework and delays. There are several cost factors that are affecting the quality of the public sector projects. Cost and Quality both are interrelated, directly dependent on each other. Identification of important factors along with its priority could be beneficial for the successful project completion. This research will help to identify the factors which are critically associate with cost as well as quality. Moreover, it is further required to integrate inter-relationship between cost and the quality in the Public sector development projects.Methodology This research was executed through survey and interviews, using the self-managed questionnaires among the respondents including top level management to lower level management of the PSDP, Punjab, Pakistan. The data was analyzed through Statistical Package for Social Sciences (SPSS-20). To measure the impact of each variable Likert scale was used. Moreover, Regression Model, Correlation, Anova Test, coefficient of determination and Standard error of estimated also used.Research Findings This study revealed that there is highly positive and significant relationship between cost and quality of the PSDP, Punjab, Pakistan. This study has also categorized the most vital factors affecting cost and quality within PSDP, Punjab, Pakistan respect to their significance. This study also subsidizes by enabling the contractor/consultants to succeed with maximum quality ensuring at reasonable cost, thus confirming safety performance within PSDP, Punjab, Pakistan. Limitations This study is limited to the PSDP, Punjab, Pakistan only.

کلیدواژه ها:

Cost ، Quality ، Public Sector Development Projects (PSDP)

نویسندگان

Ali Adnan Joiya

SIMS, Health Department, Punjab, Pakistan.

Rana Saifullah Hassan

M.Phil Scholar, Lahore Leads University,

Sajjad Mubin

Director General, Monitoring & Evaluation, P&D Department of Govt. of Punjab, Pakistan,

Syed Anwar Hassnain

Dean Evening Business School, NCBA&E, Lahore, Pakistan.

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Ahmad, A, Younis, M.S and Abmad, N. (2015), Critical Factos ...
  • Ali, M. C., Zin, R. M., Hamid, Z. A. and ...
  • Andrian and Andini (2011). Project Reliability: Probability of a Project ...
  • Arditi, D., Akan, G. T., and Gurdamar, S. (1985). "Cost ...
  • Ashworth, A. (1991). Cost studies of buildings. Longman Singapore publishers, ...
  • Avots, I. (1969). "Why does project management fail? (Project management ...
  • Clamp, H, Cox, S and Lupton S (2007) Which Contract? ...
  • Danish Social Science Research Council (SSRC). (2002). "Guidelines for research ...
  • Dissanayaka, S. M., and Kumaraswamy , M. M. (1999). :Evaluation ...
  • Dragan, L. & Bojan, S.(2014), Project Management: Cost, Time and ...
  • Fleming S.T. (1990), The Relationship between the Cost and Quality ...
  • Fleming S.T. (1991) The relationship between quality and cost: pure ...
  • Flyvbjerg, B., Holm, M. S., and Buhl, S. (2002). _ ...
  • Gaddis, P. O. (1959). The project managcr, Harvard Univ., Cambridge, ...
  • Hagan (1986), Quality management handbook, in walsh, wruster and Kimber, ...
  • Hameed, A. andI.A Rahman (2014) Factors affecting construction cost performance ...
  • Hancher, D. E., and Rowings, J. E. (1981). "Setting highway ...
  • Handa, V., and Adas, A. (1996). "Predicting the level of ...
  • Hvenegaard, Nielsen and Andrew Street (2009). Exploring the relationship between ...
  • Ibironke and Ibironke (2011), Factors Affecting Time, Cost and Quality ...
  • Idiake, J.E, Oke, A.A & Shittu, A.A. (2015). Analysis of ...
  • Iyer, K., and Jha, K. (2005). :Factors affecting cost performance: ...
  • Javed A., M. Ahsan Ullah, Azi z-ur-Rehman (2013), Factors Affecting ...
  • Johnson, Robert C.(2012), Trade and prices with heterogeneous firms, Journal ...
  • Kaliba, C, Muya, M., and Mumba, K. (2009). :Cost escalation ...
  • Kerzner, H. (1998). In search of excellence in project management, ...
  • Koushki, P., Al-Rashid, K., and Kartam, N. (2005). "Delays and ...
  • Leedy, P. D., & Ormrod, J. E. (2005). Practical research: ...
  • Liberatore, , J & Pollack-j ohnson, B. (2008). Analyzing The ...
  • Longest, B. B., Jr. 1978.A n Empirical Analysis of the ...
  • Long, N. D., Ogunlana, S., Quang, T., and Lam, K. ...
  • Morris, P.W. G., and Hough, G. _ (1987). The anatomy ...
  • Mubin, S, Abmed, M & Sial, J. (2011). Terminal Evaluation ...
  • Olawale, Y. A., and Sun, M. (2010). "Cost and time ...
  • Olsen, R. P. (1971). "Can project management be defined? Project ...
  • Ramboll, M. C. (2014). "SurveyXact." (http ://www. surveyxact .com) (Mar. ...
  • Rea, L. M., and Parker, R. A. (2012). Designing and ...
  • Rezaian, A. (2011). Time -Co st-Quality-Risk of Construction and Development ...
  • Rossi, P. H., Wright, J. D., and Anderson, A. B. ...
  • Russell D. Jonson and Brian H. Kleiner (1993), Does Higher ...
  • Sakesun S. and Nikorn S..(2011). Investigating the Relationship Between Quality ...
  • Stavrou, O. Weissman, Eyal Winkler, Eran Millet, Gil Nardini, Ariel ...
  • Thungphanich, M .(1997), "Analysis of construction problems in Thai", ASA: ...
  • Trauner, T. J. (1993). Managing the construction project: A practical ...
  • Topcu, Y. (2004), _ decision model proposal for construction contractor ...
  • Tuman, G. (1983). "Development and imp lementation of effective project ...
  • Tuman, J., Jr. (1986). "Success modeling: A technique for building ...
  • Vaxevanidis , N.M., Petropoulos, G, Avakumovic J., and Mourlas A. ...
  • Wong, C., Holt, G., & Cooper, P. (2000), "Lowest price ...
  • نمایش کامل مراجع